GitScrum / Docs

GitScrum PRO Annual — 5k+ SaaS apps via MCP

All Best Practices

Design Systems Integration | Dev Workflow Sync

Design system integration requires dedicated project tracking for components. GitScrum coordinates design-dev stages, documents components in NoteVault, and links features to system.

4 min read

How to integrate design systems with development workflow?

Integrate design systems by creating a dedicated design system project, tracking component development through design-dev stages, documenting components in NoteVault, and using labels to link feature work to design system components. Coordinate releases between design system updates and consuming applications to prevent breaking changes.

Design system board columns

ColumnPurpose
BacklogRequested components
DesignFigma/design specs
DevelopmentReact/Vue implementation
DocumentationStorybook, usage docs
ReviewDesign + code review
TestingVisual regression
ReleasedPublished version

Design system labels

LabelPurpose
component:buttonButton component
component:modalModal component
component:formForm components
type:new-componentBrand new component
type:enhancementExisting component update
type:bugComponent bug fix
breaking-changeRequires consumer updates
documentationDocs-only change

Component task template

## Component: [Name]

### Design Spec
- Figma: [link]
- Designer: @designer

### Variants
- [ ] Default
- [ ] Primary
- [ ] Secondary
- [ ] Disabled
- [ ] Loading

### States
- [ ] Hover
- [ ] Focus
- [ ] Active
- [ ] Error

### Props
| Prop | Type | Default | Description |
|------|------|---------|-------------|
| variant | string | 'default' | Visual variant |
| disabled | boolean | false | Disabled state |
| onClick | function | - | Click handler |

### Accessibility
- [ ] Keyboard navigation
- [ ] Screen reader labels
- [ ] Focus management

### Testing
- [ ] Unit tests
- [ ] Visual regression tests
- [ ] A11y tests

### Documentation
- [ ] Storybook stories
- [ ] Usage examples
- [ ] Props documentation

Design system workflow:

  • Request component - Feature team identifies need
  • Design spec - Designer creates Figma spec
  • Design review - Approve design before dev
  • Development - Build component
  • Code review - Standard PR review
  • Documentation - Storybook stories
  • Visual testing - Regression tests
  • Release - Semantic version bump
  • Announce - Notify consuming teams
  • NoteVault design system documentation

    # Design System
    
    ## Component Inventory
    
    | Component | Status | Version | Owner |
    |-----------|--------|---------|-------|
    | Button | Stable | 2.1.0 | @dev-a |
    | Modal | Stable | 1.4.0 | @dev-b |
    | DataTable | Beta | 0.9.0 | @dev-c |
    | DatePicker | In Dev | - | @dev-a |
    
    ## Design Tokens
    - Colors: [link to tokens]
    - Typography: [link to tokens]
    - Spacing: [link to tokens]
    
    ## Migration Guides
    - v1 to v2: [link]
    - Button API changes: [link]
    
    ## Release Process
    1. Bump version following semver
    2. Update changelog
    3. Run visual regression
    4. Publish to npm
    5. Announce in #design-system
    

    Coordinating with feature teams

    ScenarioProcess
    New component neededCreate request in DS project
    Feature blocked on DSLabel: blocked:design-system
    Breaking change comingNotify 2 weeks before release
    Legacy migrationCreate migration tasks

    Related articles