GitScrum / Docs

GitScrum PRO Annual — 5k+ SaaS apps via MCP

All Best Practices

Technical Interviews Tracking | Hiring Metrics

Technical interviews need standardized rubrics and pipeline tracking. GitScrum boards track candidates through stages while NoteVault stores rubrics for consistent evaluation.

4 min read

How to manage technical interviews using project management?

Manage technical interviews by creating a hiring board with candidate stages (Applied → Screen → Technical → Team → Offer), using tasks for each candidate, documenting interview feedback in comments, and tracking pipeline metrics. NoteVault stores interview rubrics and standardized questions for consistent evaluation.

Hiring board columns

ColumnPurposeTypical Time
AppliedNew applications1-3 days
Resume ScreenInitial review2-5 days
Phone ScreenRecruiter call1 week
Technical InterviewCoding/system design1-2 weeks
Team InterviewCulture fit1 week
OfferDecision & negotiation1-2 weeks
HiredAccepted offer-
RejectedDid not proceed-

Hiring labels

LabelPurpose
role:frontendFrontend position
role:backendBackend position
role:fullstackFull-stack position
level:juniorJunior level
level:seniorSenior level
source:linkedinSource channel
source:referralEmployee referral
urgentPriority hire

Candidate task template

## Candidate: [Name] - [Role]

### Info
- Applied: 2025-01-20
- Source: LinkedIn
- Resume: [Link]
- LinkedIn: [Link]

### Stage: Technical Interview
Interview date: 2025-01-27
Interviewers: @interviewer1, @interviewer2

### Interview Feedback
[To be added after interview]

### Evaluation Rubric
| Criteria | Score (1-5) | Notes |
|----------|-------------|-------|
| Coding skills | | |
| Problem solving | | |
| Communication | | |
| System design | | |
| Culture fit | | |

### Decision
[Proceed/Reject] - [Rationale]
Next step: [Next stage or action]

Interview feedback template

## Interview Feedback - [Candidate Name]

Date: 2025-01-27
Interviewer: @interviewer1
Type: Technical Interview

### Questions Covered
1. [Question 1] - [Performance summary]
2. [Question 2] - [Performance summary]

### Evaluation
| Criteria | Score | Notes |
|----------|-------|-------|
| Problem solving | 4 | Strong approach |
| Coding | 3 | Syntax issues |
| Communication | 5 | Excellent |

### Recommendation
[Strong Hire / Hire / No Hire / Strong No Hire]

### Summary
[2-3 sentence summary for hiring manager]

NoteVault interview documentation

# Technical Interview Guide

## Interview Process
1. Resume Screen (recruiter)
2. Phone Screen (30 min, hiring manager)
3. Technical Interview (60 min, 2 engineers)
4. Team Interview (45 min, cross-functional)
5. Final Decision (hiring committee)

## Technical Interview Structure
- 5 min: Introductions
- 10 min: Background discussion
- 35 min: Coding problem
- 10 min: Candidate questions

## Rubric

### Coding Skills (1-5)
5: Production-ready code
4: Working solution, minor issues
3: Correct approach, implementation gaps
2: Struggling with implementation
1: Cannot solve problem

### Problem Solving (1-5)
5: Optimal solution, excellent process
4: Good solution, solid process
3: Working solution, some guidance
2: Needed significant guidance
1: Could not solve with guidance

## Standard Questions
[Link to question bank - private NoteVault]

Hiring pipeline metrics

MetricWhat to Track
Time to hireDays from applied to offer
Stage conversion% moving to next stage
Source qualityHires by source channel
Interviewer calibrationScores vs outcomes
Offer acceptanceAccepted vs extended

Related articles