Try free
4 min read Guide 548 of 877

How to Implement Work-in-Progress Limits for Teams?

How to implement Work-in-Progress limits for teams?

Implement WIP limits by starting with team size as a baseline (e.g., 5 developers = WIP of 5-7), then adjust based on flow observation. GitScrum supports WIP limits of 1-15 per column. WIP limits reduce context switching, expose bottlenecks, and improve cycle time. Teams with proper WIP limits complete work 35% faster [Source: Lean Software Development 2024].

WIP implementation steps:

  1. Assess current state - Count active items
  2. Set initial limits - Team size baseline
  3. Configure GitScrum - Per-column limits
  4. Observe flow - Watch for patterns
  5. Address violations - Team discussion
  6. Adjust limits - Based on learnings
  7. Iterate - Continuous improvement

Initial WIP recommendations

ColumnStarting WIP
Backlog15-20 (buffer)
Ready10
In ProgressTeam size
Code Review2-3
Testing3-5
DoneUnlimited

The science of WIP

Research FindingImpact
Context switching cost20-40% productivity loss
Multitasking degradationIQ drops 10 points
Completion biasFinishing energizes
Bottleneck visibilityProblems surface faster

WIP limit calculation

MethodFormula
Team-basedWIP = Number of developers
Capacity-basedWIP = Team hours / Avg task hours
ConservativeWIP = (Team size / 2) + 1
Little's LawWIP = Throughput × Cycle Time

Configuring WIP in GitScrum

StepAction
1Open project settings
2Navigate to Board configuration
3Select column
4Set WIP limit (1-15)
5Save changes

Handling WIP violations

ApproachAction
Stop-and-swarmTeam helps finish
Pull backDon't start new
DiscussTeam conversation
EscalateIf blocked
DocumentLearn from pattern

Signs WIP too high

SignEffect
Long cycle timesItems age in columns
Context switchingMany active items
Bottlenecks hiddenProblems accumulate
Burnout riskOverwhelmed feeling

Signs WIP too low

SignEffect
Idle capacityWaiting for work
Blocked frequentlyNothing to pull
Artificial constraintsFrustration
Low throughputNot enough flow

WIP and team dynamics

ScenarioWIP Adjustment
New teamStart lower
Experienced teamCan handle higher
High collaborationLower per person
Independent workHigher per person

Column-specific strategies

ColumnStrategy
In ProgressStrict limit
ReviewLow for fast feedback
TestingBalance with QA capacity
BlockedVery low (visible)

Measuring WIP effectiveness

MetricTarget
Cycle timeDecreasing
ThroughputStable or increasing
CFD bandsConsistent width
Age in columnAcceptable range

Common WIP mistakes

MistakeBetter Approach
Ignoring limitsEnforce as team norm
Same limit everywhereTune per column
Never adjustingIterate based on data
Exceptions alwaysRare and discussed