7 min read • Guide 217 of 877
Managing Small Development Teams
Small teams need project management, but not enterprise-level overhead. The goal is just enough structure to stay aligned and ship fast—no more. Small teams have advantages: less communication overhead, faster decisions, and agility. Don't waste them with heavy process.
Small Team Advantages
| Large Team Challenge | Small Team Advantage |
|---|---|
| Communication overhead | Talk directly |
| Decision delays | Decide now |
| Coordination meetings | Everyone knows already |
| Process for alignment | Natural alignment |
| Documentation for scale | Context in heads |
Minimal Setup
Simple Board
SMALL TEAM BOARD
════════════════
MINIMAL COLUMNS:
─────────────────────────────────────
To Do → Doing → Done
That's it. Really.
ONLY ADD WHEN NEEDED:
├── Review column → If PRs queue up
├── Blocked column → If blockers frequent
├── Testing column → If QA is separate
└── Don't add speculatively
LABELS (minimal):
─────────────────────────────────────
├── bug (red)
├── feature (blue)
├── urgent (orange)
└── That's probably enough
NO:
├── Complex label hierarchies
├── Story points (yet)
├── Sprints (maybe later)
├── Epics (just group by name)
└── Custom fields (overhead)
Lightweight Rituals
SMALL TEAM RITUALS
══════════════════
DAILY (5 min max):
─────────────────────────────────────
Quick sync - can be async:
├── What's everyone doing?
├── Any blockers?
└── That's it
OR: Just look at the board.
If board is current, no standup needed.
WEEKLY (30 min):
─────────────────────────────────────
Planning + retro combined:
├── What shipped last week? (5 min)
├── What's priority this week? (10 min)
├── Order the To Do column (5 min)
├── Anything to improve? (5 min)
├── Any blockers? (5 min)
└── Done. Back to work.
THAT'S ALL:
├── No 2-hour sprint planning
├── No separate backlog grooming
├── No elaborate retrospectives
├── No demo meeting (show in Slack)
└── Keep ceremonies minimal
Working Style
Direct Communication
SMALL TEAM COMMUNICATION
════════════════════════
DIRECT > FORMAL:
─────────────────────────────────────
Large team:
├── Create ticket
├── Add details
├── @mention PM
├── Wait for triage
├── Discuss in comments
├── Get assigned
└── Finally start
Small team:
├── "Hey, I'm picking up the login bug"
├── "Cool"
└── Start
STILL TRACK:
─────────────────────────────────────
├── Card for each piece of work
├── Move when status changes
├── For visibility (not bureaucracy)
├── Keep it simple
DON'T:
├── Over-formalize communication
├── Create process for 2 people
├── Add approvals
├── Introduce bureaucracy
└── These kill small team speed
Shared Ownership
SMALL TEAM OWNERSHIP
════════════════════
EVERYONE DOES EVERYTHING:
─────────────────────────────────────
Traditional role separation:
├── Frontend dev
├── Backend dev
├── QA
├── DevOps
├── PM
└── 5 roles = 5 people minimum
Small team reality:
├── Sarah: Full-stack + some DevOps
├── Mike: Full-stack + some product
├── Alex: Full-stack + QA focus
└── 3 people, all capabilities
BENEFITS:
├── No handoff overhead
├── Everyone understands whole system
├── Cover for each other
├── Faster decisions
└── Less "not my job"
MAKE IT WORK:
├── Cross-train intentionally
├── Pair on unfamiliar areas
├── Rotate responsibilities
├── Document enough to hand off
When to Add Process
Growth Triggers
WHEN TO ADD STRUCTURE
═════════════════════
ADD SPRINTS WHEN:
─────────────────────────────────────
├── Stakeholders ask "when will X ship?"
├── Team loses rhythm without cadence
├── Planning benefits from time-boxing
└── NOT because "teams should have sprints"
ADD STORY POINTS WHEN:
─────────────────────────────────────
├── Need to forecast timelines
├── Comparing effort matters
├── Team is stable enough to calibrate
└── NOT because "agile requires them"
ADD MORE ROLES WHEN:
─────────────────────────────────────
├── Person is at capacity (not before)
├── Specific skill gap hurts
├── Growth justifies specialization
└── NOT speculatively
ADD DOCUMENTATION WHEN:
─────────────────────────────────────
├── Same question asked twice
├── New person joining
├── Critical knowledge in one head
└── NOT for documentation's sake
RULE: Solve real problems, not imagined ones.
Scaling Preparation
PREPARING TO SCALE
══════════════════
FROM 3 → 5 PEOPLE:
─────────────────────────────────────
Keep what works:
├── Simple board
├── Direct communication
├── Quick standups
└── Ship focus
Add lightly:
├── Maybe sprints (if helpful)
├── Slightly more documentation
├── Clearer ownership areas
└── Still minimal
FROM 5 → 10 PEOPLE:
─────────────────────────────────────
Likely need:
├── More formal ceremonies
├── Clear role definitions
├── Better documentation
├── Sub-team structure
├── More process
└── Still fight overhead
KEY: Don't scale process before people.
Productivity Focus
Shipping Fast
SMALL TEAM SHIPPING
═══════════════════
SPEED ADVANTAGES:
─────────────────────────────────────
├── Fewer approvals
├── Direct decisions
├── Less coordination
├── Quick pivots
├── Less overhead
└── USE THEM
PRACTICES:
─────────────────────────────────────
Small batches:
├── Ship daily if possible
├── Small PRs
├── Feature flags for incomplete
└── Deploy constantly
Fast feedback:
├── Show users quickly
├── Iterate based on reality
├── Don't over-plan
└── Learn by shipping
Low ceremony:
├── Skip unnecessary meetings
├── Communicate in code
├── Demo by deploying
└── Retro by chatting
Focus Protection
PROTECTING FOCUS TIME
═════════════════════
SMALL TEAM = FEW PEOPLE:
─────────────────────────────────────
Each person matters more
Interruptions hurt more
Protect focus ruthlessly
PRACTICES:
─────────────────────────────────────
Async default:
├── Slack over meetings
├── Response within hours OK
├── Deep work blocks
└── Interrupt only if urgent
Batch meetings:
├── All meetings on one day
├── Rest = focus days
├── Even for 3 people, helps
└── Maker vs. manager schedule
WIP limits:
├── 1-2 things per person
├── Finish before starting
├── No context switching tax
└── More throughput with fewer threads
GitScrum for Small Teams
Minimal Configuration
GITSCRUM SMALL TEAM SETUP
═════════════════════════
ONE PROJECT:
─────────────────────────────────────
├── Single project for all work
├── Labels for types
├── No multiple boards
└── Keep it simple
BOARD:
─────────────────────────────────────
Three columns: To Do | Doing | Done
├── Maybe add Review later
└── Resist more columns
SETTINGS:
─────────────────────────────────────
├── Sprints: Off (optional)
├── Story points: Off (optional)
├── Time tracking: Off (unless needed)
├── Automation: Minimal
└── Add when needed
WORKFLOW:
─────────────────────────────────────
├── Create card
├── Pick card from top
├── Move to Doing
├── Work
├── Move to Done
├── Repeat
THAT'S IT:
No elaborate workflow
No complex transitions
No approval gates
Just work
Best Practices
For Small Teams
- Start minimal — Add only when pain emerges
- Stay flexible — Don't lock into process
- Communicate directly — Don't over-formalize
- Ship constantly — Use your agility
- Resist overhead — Every ceremony costs
Anti-Patterns
SMALL TEAM MISTAKES:
✗ Copying enterprise processes
✗ Story points on 3-person team
✗ Complex workflow columns
✗ Long planning sessions
✗ Separate PM (just do it together)
✗ Over-documentation
✗ Meetings for meeting's sake
✗ Process theater