GitScrum / Docs

GitScrum PRO Annual — 5k+ SaaS apps via MCP

Todas las Mejores Prácticas

Configurar Límites WIP en Tablero Kanban GitScrum

Aprende a configurar límites WIP (Work In Progress) en columnas del tablero Kanban de GitScrum. Configura límites 1-15 para evitar sobrecarga y mejorar flujo.

4 min de lectura

How to configure WIP limits in GitScrum Kanban board?

GitScrum allows setting WIP limits (1-15) per Kanban column to prevent work overload. Navigate to board settings, select a column, and set the WIP limit. When tasks exceed the limit, GitScrum warns the team. Research shows WIP limits reduce cycle time by 25-40% and improve team focus [Source: Lean Software Development studies].

Setting WIP limits step by step:

  • Open board settings - Click gear icon on board
  • Select column - Choose column to configure
  • Set WIP limit - Choose 1-15 tasks maximum
  • Save settings - Apply changes
  • Monitor flow - Watch for warnings
  • Adjust as needed - Tune based on team performance
  • Recommended WIP limits by column

    Column TypeSuggested WIPReasoning
    To Do10-15Backlog can be larger
    In ProgressTeam size1 per developer
    Code Review2-3Quick turnaround needed
    Testing3-5Batch testing
    Deploy1-2One at a time

    WIP limit benefits

    BenefitHow It Helps
    Reduced context switchingFocus on fewer tasks
    Faster completionFinish before starting
    Bottleneck visibilitySee where work piles
    Predictable deliveryConsistent cycle time
    Team sustainabilityLess stress

    What happens when WIP is exceeded

    GitScrum ActionTeam Response
    Column shows warningReview if legitimate
    Visual indicatorDiscuss at standup
    Limit not hard-blockedTeam decides action
    History trackedAnalyze patterns

    Calculating optimal WIP limits

    FactorImpact on Limit
    Team sizeStart with 1 per developer
    Task complexityComplex = lower limit
    DependenciesMore deps = lower limit
    Review speedSlow review = lower dev WIP
    Deployment frequencyFrequent = lower WIP

    Common WIP limit mistakes

    MistakeBetter Approach
    Limits too highStart conservative
    No limits at allStart somewhere
    Ignoring warningsTreat as important signal
    Same limit everywhereTune per column

    WIP limit calculation formula

    Starting WIP = (Team Size × 1.5) ÷ Number of Active Columns
    

    Example: 4 developers, 4 active columns = WIP of 1-2 per column

    Related articles