GitScrum / Docs

GitScrum PRO Annual — 5k+ SaaS apps via MCP

Toutes les Bonnes Pratiques

Équipes Backend Développement | GitScrum

Utilisez GitScrum pour équipes backend. Configurez workflows API, base de données et microservices. -35% problèmes intégration.

4 min de lecture

How to use GitScrum for backend development teams?

GitScrum supports backend development with columns for API design, development, testing, and deployment. Configure WIP limits for backend workflow, use labels for service components, document APIs in NoteVault, and track with Team Standup. Backend teams using structured PM reduce integration issues by 35% [Source: Backend Development Survey 2024].

Backend project setup:

  • Create project - Backend system name
  • Configure columns - Backend workflow
  • Add service labels - Component tracking
  • Set WIP limits - Focus on completion
  • Create NoteVault docs - API documentation
  • Enable Team Standup - Async updates
  • Backend development columns

    ColumnWIP LimitPurpose
    Backlog15All backend tasks
    API Design3Design phase
    DevelopmentTeam sizeActive coding
    Code Review3PR review
    Testing5Unit + integration
    Staging2Pre-production
    Production1Deployment

    Backend-specific labels

    CategoryLabels
    Serviceuser-service, payment, auth
    Typeapi, database, integration
    Layercontroller, service, repository
    Priorityp1, p2, p3, p4
    Statusblocked, needs-api, needs-db

    API development workflow

    StageActions
    DesignOpenAPI spec, review
    DevelopmentImplement endpoints
    Unit testPytest, Jest
    IntegrationService tests
    DocumentationUpdate NoteVault
    DeployStaging then production

    Backend documentation in NoteVault

    DocumentContent
    API ReferenceEndpoints, schemas
    Database SchemaTables, relationships
    ArchitectureSystem design
    Integration GuideHow to consume APIs
    RunbooksOperations

    Microservices tracking

    PatternImplementation
    Service labelsFilter by service
    Cross-service depsDependency labels
    ContractsNoteVault docs
    Deployment orderSequence tracking
    RollbackDocumented in NoteVault

    Database work tracking

    Task TypeLabel
    Migrationdb-migration
    Schema changedb-schema
    Query optimizationdb-perf
    Data fixdb-data
    Backup/restoredb-ops

    Backend testing workflow

    Test TypeColumn/Label
    Unit testsTesting column
    Integrationtesting-integration
    Load testingtesting-load
    Securitytesting-security
    Contracttesting-contract

    Auto-assign for backend

    ColumnAuto-Assign
    Code ReviewSenior backend devs
    TestingQA team
    StagingDevOps
    ProductionDevOps lead

    Backend-specific WIP patterns

    ScenarioWIP Strategy
    API-heavyLimit concurrent APIs
    DB migrationsOne at a time
    MicroservicesPer-service limit
    IntegrationLimit cross-service

    Related articles