GitScrum / Docs

GitScrum PRO Annual — 5k+ SaaS apps via MCP

Toutes les Bonnes Pratiques

Projets Développement Blockchain | GitScrum

Gérez projets développement blockchain avec GitScrum. Tracez smart contracts, protocoles et coordonnez équipes Web3. -60% vulnérabilités.

4 min de lecture

How to use GitScrum for blockchain development projects?

Manage blockchain development in GitScrum with labels for contract development, protocol work, and DApp features. Include security audit in workflow, track testnet deployments, document smart contract specs in NoteVault. Blockchain teams with structured workflow reduce vulnerabilities by 60% [Source: Blockchain Security Research 2024].

Blockchain workflow:

  • Specification - Contract design
  • Development - Implementation
  • Testing - Unit + integration
  • Audit - Security review
  • Testnet - Testnet deploy
  • Verification - Testnet testing
  • Mainnet - Production deploy
  • Blockchain labels

    LabelPurpose
    type-contractSmart contracts
    type-dappDApp frontend
    type-protocolProtocol work
    type-integrationThird-party
    security-auditNeeds audit
    network-testnetTestnet work
    network-mainnetMainnet work

    Blockchain columns

    ColumnPurpose
    BacklogAll work
    DevelopmentCoding
    TestingContract tests
    Security AuditExternal audit
    TestnetTestnet deploy
    MainnetProduction

    NoteVault blockchain documentation

    DocumentContent
    Contract specsFunction specifications
    Security modelThreat analysis
    Audit reportsAudit findings
    Deployment guideDeploy procedures
    Network configNetwork settings

    Smart contract task template

    ## Contract: [name]
    
    ### Specification
    - Purpose: [description]
    - Functions: [list]
    - State: [variables]
    
    ### Security Considerations
    - Access control: [approach]
    - Reentrancy: [protection]
    - Integer overflow: [handling]
    
    ### Testing
    - [ ] Unit tests (100% coverage)
    - [ ] Integration tests
    - [ ] Fuzzing
    - [ ] Formal verification
    
    ### Audit
    - [ ] Internal review
    - [ ] External audit
    - [ ] Findings addressed
    
    ### Deployment
    - [ ] Testnet deployed
    - [ ] Testnet verified
    - [ ] Mainnet deployed
    - [ ] Mainnet verified
    

    Security audit workflow

    PhaseAction
    PrepareCode freeze
    SubmitSend to auditor
    ReviewAuditor reviews
    ReportReceive findings
    FixAddress issues
    VerifyRe-audit fixes
    ApproveAudit pass

    Audit finding severity

    SeverityResponse
    CriticalMust fix before deploy
    HighMust fix before deploy
    MediumShould fix
    LowConsider fixing
    InformationalAwareness

    Testnet deployment checklist

    CheckVerify
    All tests pass100% coverage
    Audit completeFindings addressed
    Deploy scriptTested
    VerificationContract verified
    IntegrationDApp connected

    DApp development

    LayerTasks
    Smart contractsOn-chain logic
    BackendOff-chain services
    FrontendUser interface
    WalletWallet integration

    Gas optimization tasks

    TaskFocus
    Gas profilingIdentify expensive ops
    OptimizationReduce gas usage
    BatchingCombine operations
    TestingGas regression tests

    Common blockchain issues

    IssueSolution
    Security vulnerabilitiesAudit + review
    Gas costsOptimization tasks
    Upgrade issuesUpgrade pattern docs
    Failed transactionsError handling

    Blockchain metrics

    MetricTrack
    Audit findingsBy severity
    Test coverage% covered
    Gas costsPer function
    Transaction success% successful

    Related articles