GitScrum / Docs

GitScrum PRO Annual — 5k+ SaaS apps via MCP

Toutes les Bonnes Pratiques

Collaboration Design-Dev | GitScrum

Coordonnez équipes design et développement avec GitScrum. Suivez transferts, gérez feedback et optimisez workflow design-code. -40% retravail.

4 min de lecture

How to use GitScrum for design and development collaboration?

Coordinate design and development in GitScrum with shared boards, design task labels, and clear handoff columns. Track design specs in NoteVault, use Design Review column for approval, link design to development tasks. Teams with integrated design workflow reduce rework by 40% [Source: Product Design Research 2024].

Design-dev workflow:

  • Requirements - Product defines need
  • Design - Designer creates solution
  • Design Review - Stakeholder approval
  • Handoff - Design to development
  • Development - Build the design
  • Dev Review - Code review
  • QA - Verify matches design
  • Design collaboration labels

    LabelPurpose
    type-designDesign work
    design-uiUI design
    design-uxUX research
    design-reviewNeeds review
    design-readyHandoff ready
    needs-designDev needs design

    Collaboration columns

    ColumnOwner
    BacklogProduct
    DesignDesign team
    Design ReviewStakeholders
    Design ReadyHandoff
    DevelopmentDev team
    DoneBoth

    Design handoff checklist

    ItemContent
    ☐ SpecsDimensions, spacing
    ☐ AssetsIcons, images
    ☐ PrototypeInteractive demo
    ☐ StatesAll UI states
    ☐ ResponsiveBreakpoint specs
    ☐ AccessibilityA11y requirements

    NoteVault design documentation

    DocumentContent
    Design systemComponents, patterns
    Style guideColors, typography
    SpecsFeature specifications
    ResearchUser research findings
    DecisionsDesign rationale

    Design task template

    ## Design: [feature]
    
    ### Requirements
    - User goal: [goal]
    - Business goal: [goal]
    
    ### Deliverables
    - [ ] Wireframes
    - [ ] High-fidelity mockups
    - [ ] Prototype
    - [ ] Specs document
    
    ### Links
    - Figma: [link]
    - Prototype: [link]
    - Specs: [NoteVault link]
    
    ### Handoff Checklist
    - [ ] All states designed
    - [ ] Responsive views
    - [ ] Assets exported
    - [ ] Specs written
    - [ ] Review approved
    

    Column subscribers

    ColumnSubscribers
    Design ReviewStakeholders
    Design ReadyDevelopers
    Needs DesignDesigners

    Feedback workflow

    StepAction
    Share designLink in task
    Collect feedbackComments
    IterateUpdate design
    ApproveMove to Ready

    Design-dev sync meetings

    MeetingPurpose
    Design reviewShow work, get feedback
    Sprint planningCoordinate capacity
    Handoff sessionClarify specs
    RetroImprove process

    Common collaboration issues

    IssueSolution
    Late designsPipeline visibility
    Unclear specsHandoff checklist
    ReworkDesign review column
    Communication gapsShared board

    Design capacity in sprints

    ApproachImplementation
    Ahead by 1 sprintDesign leads dev
    Same sprintParallel work
    Dedicated design sprintLarge features

    Design QA

    CheckVerify
    Matches specsPixel comparison
    All statesEdge cases
    ResponsiveAll breakpoints
    AccessibilityA11y compliance

    Related articles