Try free
5 min read Guide 500 of 877

How to Implement Continuous Deployment Safely

Continuous deployment accelerates delivery but requires robust safety mechanisms to prevent production issues. GitScrum's release tracking, feature flag management, and deployment pipeline integration help teams deploy confidently while maintaining the visibility and control needed to respond quickly when issues arise.

CD Safety Layers

LayerPurposeWhen It Catches Issues
Automated TestsCatch bugs before deployBuild time
Code ReviewCatch design issuesPre-merge
StagingIntegration issuesPre-production
Canary DeployProduction issues with subsetEarly production
Feature FlagsControl exposureAny time
MonitoringRuntime issuesProduction
RollbackRecoveryWhen issues detected

Safe Deployment Pipeline

CONTINUOUS DEPLOYMENT PIPELINE

┌─────────────────────────────────────────────────┐
│  COMMIT                                         │
│  ├── Automated tests (unit, integration)        │
│  ├── Static analysis                            │
│  └── Build artifact                             │
└────────────────────┬────────────────────────────┘
                     │ If all pass
                     ▼
┌─────────────────────────────────────────────────┐
│  CODE REVIEW                                    │
│  ├── Peer review                                │
│  ├── Automated security scan                    │
│  └── Merge to main                              │
└────────────────────┬────────────────────────────┘
                     │ If approved
                     ▼
┌─────────────────────────────────────────────────┐
│  STAGING DEPLOY                                 │
│  ├── Full integration tests                     │
│  ├── E2E tests                                  │
│  └── Performance baseline                       │
└────────────────────┬────────────────────────────┘
                     │ If all pass
                     ▼
┌─────────────────────────────────────────────────┐
│  CANARY PRODUCTION (5% traffic)                 │
│  ├── Error rate monitoring                      │
│  ├── Latency monitoring                         │
│  └── Business metrics                           │
│                                                 │
│  If anomaly → Auto rollback                     │
└────────────────────┬────────────────────────────┘
                     │ If healthy (15-30 min)
                     ▼
┌─────────────────────────────────────────────────┐
│  GRADUAL ROLLOUT                                │
│  ├── 5% → 25% → 50% → 100%                      │
│  ├── Continued monitoring                       │
│  └── Manual pause available                     │
└─────────────────────────────────────────────────┘

Feature Flag Strategy

FEATURE FLAG FOR SAFE RELEASE

CODE DEPLOYMENT (always):
┌─────────────────────────────────────────────────┐
│  // New feature code deployed                   │
│  if (featureFlags.isEnabled('new-checkout')) {  │
│    return newCheckoutFlow();                    │
│  } else {                                       │
│    return existingCheckoutFlow();               │
│  }                                              │
└─────────────────────────────────────────────────┘

ROLLOUT STAGES:
┌─────────────────────────────────────────────────┐
│  Day 1: Internal team (dogfooding)              │
│  Day 3: Beta users (opt-in)                     │
│  Day 5: 10% of users (random)                   │
│  Day 7: 50% of users                            │
│  Day 10: 100% of users                          │
│  Day 14: Remove flag, clean up code             │
└─────────────────────────────────────────────────┘

INSTANT ROLLBACK:
┌─────────────────────────────────────────────────┐
│  Issue detected?                                │
│  → Turn off flag                                │
│  → All users back to old flow                   │
│  → No deployment needed                         │
│  → Fix and retry rollout                        │
└─────────────────────────────────────────────────┘

Monitoring Requirements

PRODUCTION MONITORING ESSENTIALS

ERROR MONITORING:
┌─────────────────────────────────────────────────┐
│  • Exception tracking (Sentry, Bugsnag)         │
│  • Error rate baseline + alerting               │
│  • Error spike detection                        │
│  • Correlation with deployments                 │
└─────────────────────────────────────────────────┘

PERFORMANCE MONITORING:
┌─────────────────────────────────────────────────┐
│  • Response time (p50, p95, p99)                │
│  • Throughput                                   │
│  • Database query time                          │
│  • External API latency                         │
└─────────────────────────────────────────────────┘

BUSINESS METRICS:
┌─────────────────────────────────────────────────┐
│  • Conversion rates                             │
│  • User actions per session                     │
│  • Revenue (if applicable)                      │
│  • User engagement                              │
└─────────────────────────────────────────────────┘

ALERTING THRESHOLDS:
┌─────────────────────────────────────────────────┐
│  Error rate > 1% increase  → Auto-rollback      │
│  P95 latency > 2x baseline → Alert on-call      │
│  Conversion drop > 5%      → Pause rollout      │
└─────────────────────────────────────────────────┘

Rollback Strategy

AUTOMATED ROLLBACK TRIGGERS

┌─────────────────────────────────────────────────┐
│  AUTOMATIC ROLLBACK IF:                         │
│  ├── Error rate > threshold                     │
│  ├── Health check failures                      │
│  ├── Critical metric degradation                │
│  └── Deployment timeout                         │
│                                                 │
│  ROLLBACK SPEED:                                │
│  └── < 60 seconds from detection to complete    │
│                                                 │
│  ROLLBACK TYPES:                                │
│  ├── Feature flag disable (instant)             │
│  ├── Previous version redeploy (minutes)        │
│  └── Database migration rollback (if needed)    │
│                                                 │
│  POST-ROLLBACK:                                 │
│  ├── Alert team                                 │
│  ├── Preserve logs and state                    │
│  ├── Auto-create incident                       │
│  └── Block future deploys until resolved        │
└─────────────────────────────────────────────────┘

Best Practices

  1. Start with CI/CD foundation before CD
  2. Build comprehensive test suite first
  3. Implement feature flags for new features
  4. Deploy small changes frequently
  5. Monitor everything measurable
  6. Automate rollback don't rely on humans
  7. Practice incident response regularly
  8. Track deployment success rate over time

Anti-Patterns

✗ Continuous deployment without testing
✗ Big bang releases even with CD
✗ No feature flags = no safety net
✗ Manual monitoring for deployments
✗ No rollback automation
✗ Ignoring monitoring alerts