8 min read • Guide 276 of 877
Streamlining Development Processes
Development processes should help teams deliver, not slow them down. Streamlining means eliminating unnecessary steps, automating repetitive work, and reducing handoffs. The goal is getting code from idea to production as smoothly as possible.
Process Friction
| Friction Point | Impact | Solution |
|---|---|---|
| Slow code review | Days waiting | Review SLA |
| Manual deployment | Risk, delays | CI/CD automation |
| Unclear requirements | Rework | Better grooming |
| Too many approvals | Bottleneck | Reduce gates |
| Context switching | Productivity loss | WIP limits |
Finding Friction
Process Mapping
MAP YOUR CURRENT PROCESS
════════════════════════
STEP 1: LIST EVERY STEP
─────────────────────────────────────
From idea to production:
1. Requirement created
2. Groomed/refined
3. Sprint planning
4. Development starts
5. Local testing
6. Create PR
7. Wait for review
8. Review feedback
9. Address feedback
10. Merge
11. Deploy to staging
12. QA testing
13. Deploy to production
14. Monitor
STEP 2: MEASURE TIME
─────────────────────────────────────
For each step, track:
├── Active time (actually working)
├── Wait time (sitting idle)
└── Total time
Example:
Step Active Wait Total
────────────────────────────────────────────
Development 16h - 16h
Wait for review - 48h 48h
Review 2h - 2h
Address feedback 4h - 4h
Wait for QA - 24h 24h
QA testing 4h - 4h
Deploy prod 1h - 1h
────────────────────────────────────────────
TOTAL 27h 72h 99h
Active: 27 hours (27%)
Waiting: 72 hours (73%)
INSIGHT: 73% of time is waiting.
STEP 3: IDENTIFY BOTTLENECKS
─────────────────────────────────────
Biggest wait times:
├── Code review: 48h → reduce first
├── QA queue: 24h → reduce second
├── These are your targets
└── 80/20: Fix biggest impact first
Eliminating Waste
Remove Unnecessary Steps
WASTE ELIMINATION
═════════════════
TYPES OF WASTE:
─────────────────────────────────────
WAITING:
├── For review
├── For approval
├── For information
├── For environment
└── Reduce by: SLAs, automation, self-service
HANDOFFS:
├── Dev to QA
├── Team to team
├── Person to person
└── Reduce by: Cross-functional teams
REWORK:
├── Bugs from poor specs
├── Fixes after review
├── Rollback and redo
└── Reduce by: Better quality upfront
OVERPROCESSING:
├── Approvals nobody reads
├── Documentation nobody uses
├── Meetings for everything
└── Reduce by: Eliminate if not adding value
MOTION:
├── Switching between tools
├── Finding information
├── Context switching
└── Reduce by: Consolidate tools, reduce WIP
QUESTION EACH STEP:
─────────────────────────────────────
For every process step, ask:
├── "Does this add value?"
├── "What if we skipped it?"
├── "Can we automate it?"
├── "Can we combine it with another step?"
├── "Who decided we need this?"
└── If no good answer, eliminate
Reduce Handoffs
HANDOFF REDUCTION
═════════════════
PROBLEM:
─────────────────────────────────────
Every handoff has:
├── Wait time to pick up
├── Context loss
├── Communication overhead
├── Blame opportunity
└── Quality risk
BEFORE:
─────────────────────────────────────
Dev → Code Review → QA → Ops → Deploy
(4 handoffs = 4 opportunities for delay)
AFTER:
─────────────────────────────────────
Cross-functional team does it all:
├── Pair program (built-in review)
├── Automated tests (built-in QA)
├── CI/CD (no ops handoff)
├── Deploy on merge
└── 0 handoffs
STRATEGIES:
─────────────────────────────────────
1. Cross-functional teams
├── Team has all skills
├── No external dependencies
└── Own end-to-end
2. "You build it, you run it"
├── Team deploys their code
├── Team handles incidents
└── Full ownership
3. Shift left
├── Testing during development
├── Security in design
├── Ops concerns in code
└── Problems found earlier
4. Pair/mob programming
├── Review built-in
├── Knowledge shared
└── No waiting
Automation
What to Automate
AUTOMATION PRIORITIES
═════════════════════
HIGH VALUE (DO FIRST):
─────────────────────────────────────
Testing:
├── Unit tests on commit
├── Integration tests on PR
├── E2E tests on merge
├── Security scanning
└── No manual test passes
Deployment:
├── Build automatically
├── Deploy on merge
├── Rollback capability
├── Feature flags
└── No manual deployment steps
Code Quality:
├── Linting on save
├── Formatting on commit
├── Style checking
├── Complexity metrics
└── No manual code style reviews
MEDIUM VALUE:
─────────────────────────────────────
Notifications:
├── Deploy success/failure
├── Test failures
├── Review needed
├── Task status changes
└── No manual status updates
Environment:
├── Spin up on demand
├── Database seeding
├── Config management
└── No manual setup
AUTOMATION PRIORITY TEST:
─────────────────────────────────────
Automate if:
├── Happens frequently
├── Is rule-based (no judgment)
├── Is error-prone manually
├── Is boring for humans
├── Creates delays when manual
└── Has clear success criteria
Speed Improvements
Code Review Speed
FASTER CODE REVIEW
══════════════════
PROBLEM:
─────────────────────────────────────
PRs wait 2-3 days for review.
Biggest bottleneck for most teams.
SOLUTIONS:
─────────────────────────────────────
1. REVIEW SLA
"First review within 4 hours"
(or 24 hours max)
Track and make visible.
2. SMALL PRs
Under 400 lines.
Faster to review.
Smaller = quicker turnaround.
3. DEDICATED REVIEW TIME
10-11am: Review hour
Everyone reviews together.
No context switching.
4. PAIR PROGRAMMING
Review happens as you code.
Zero wait time.
Higher quality.
5. AUTO-ASSIGN
Round-robin assignment.
No "who should review this?"
CODEOWNERS file.
6. CI FIRST
CI must pass before human review.
Don't waste reviewer time on broken builds.
TRACKING IN GITSCRUM:
─────────────────────────────────────
Task → Status: Code Review
Track time in this status.
Alert if > 24 hours.
Dashboard visibility.
Deployment Speed
FASTER DEPLOYMENTS
══════════════════
PROBLEM:
─────────────────────────────────────
Deployment is scary, slow, infrequent.
Leads to big, risky releases.
SOLUTIONS:
─────────────────────────────────────
1. CI/CD PIPELINE
├── Automated build
├── Automated tests
├── Automated deploy
├── One click or automatic
└── No manual steps
2. FEATURE FLAGS
├── Deploy code without releasing
├── Gradual rollout
├── Quick disable if problems
├── Decouple deploy from release
└── Deploy more confidently
3. SMALLER DEPLOYMENTS
├── Deploy more often
├── Smaller changes = less risk
├── Easier to rollback
├── Faster to debug
└── "If it hurts, do it more often"
4. AUTOMATED ROLLBACK
├── One-click rollback
├── Automatic on failure
├── Previous version ready
└── Reduces deploy fear
TARGET:
─────────────────────────────────────
From: Deploy weekly (scary)
To: Deploy daily (routine)
To: Deploy on every merge (continuous)
Each step reduces risk and increases speed.
GitScrum Streamlining
Process Optimization
GITSCRUM FOR STREAMLINED PROCESS
════════════════════════════════
SIMPLE WORKFLOW:
─────────────────────────────────────
Keep minimal:
├── To Do
├── In Progress
├── Review (optional)
├── Done
└── Fewer states = less overhead
Each state = Real status, not bureaucracy
AUTOMATIONS:
─────────────────────────────────────
├── PR merged → Task to Done
├── Task assigned → Notify assignee
├── Stale 3 days → Alert
├── Status change → Update stakeholders
└── Reduce manual status updates
INTEGRATIONS:
─────────────────────────────────────
├── GitHub/GitLab: PRs link to tasks
├── CI/CD: Build status visible
├── Slack: Notifications
├── Calendar: Sprint dates
└── Single source of truth
METRICS:
─────────────────────────────────────
Track automatically:
├── Cycle time
├── Time in each status
├── Bottleneck visibility
├── Sprint velocity
└── Use data to improve
REDUCE OVERHEAD:
─────────────────────────────────────
Don't require:
├── Detailed time logging
├── Comments on every task
├── Multiple approval steps
├── Complex custom fields
└── Only what adds value
Continuous Improvement
Improvement Cycle
CONTINUOUS IMPROVEMENT
══════════════════════
REGULAR RETROSPECTIVES:
─────────────────────────────────────
Every sprint, ask:
├── What slowed us down?
├── What was frustrating?
├── What can we eliminate?
├── What can we automate?
└── Pick ONE thing to improve
SMALL EXPERIMENTS:
─────────────────────────────────────
├── Try for one sprint
├── Measure the impact
├── Keep if better
├── Revert if worse
└── Low risk experimentation
EXAMPLE IMPROVEMENTS:
─────────────────────────────────────
Sprint 1: "Code review taking 3 days"
Action: Implement 24h SLA
Result: Down to 1 day ✓
Sprint 2: "Deployment still manual"
Action: Automate staging deploy
Result: 10 min → 2 min ✓
Sprint 3: "Too many meetings"
Action: Cancel one recurring meeting
Result: +4 hours/week for team ✓
Continuous, incremental improvement.
Best Practices
For Streamlined Development
- Map your process — Understand before improving
- Measure wait time — That's where waste hides
- Automate repetitive — Humans for thinking
- Reduce handoffs — Cross-functional teams
- Small batches — Smaller = faster flow
Anti-Patterns
PROCESS MISTAKES:
✗ Adding steps without removing
✗ Approval for everything
✗ Manual repetitive tasks
✗ Big bang releases
✗ Handoffs between silos
✗ Complex workflows
✗ No measurement
✗ Never questioning "why we do it this way"