Try free
9 min read Guide 734 of 877

SaaS Development Best Practices

SaaS development has unique challenges around continuous delivery, multi-tenancy, and subscription management. GitScrum helps SaaS teams manage iterative development with agile workflows designed for continuous improvement.

SaaS Development Context

Unique Characteristics

SAAS DEVELOPMENT CHARACTERISTICS:
┌─────────────────────────────────────────────────────────────┐
│                                                             │
│ CONTINUOUS DEPLOYMENT:                                      │
│ • Ship frequently (daily or more)                          │
│ • No big-bang releases                                     │
│ • Feature flags control rollout                            │
│ • Rollback must be instant                                 │
│                                                             │
│ MULTI-TENANT:                                               │
│ • One codebase, many customers                             │
│ • Data isolation is critical                               │
│ • Performance affects everyone                             │
│ • Feature variations per plan                              │
│                                                             │
│ SUBSCRIPTION MODEL:                                         │
│ • Retention > Acquisition                                  │
│ • Churn is the enemy                                       │
│ • Value must be continuous                                 │
│ • Upgrade paths matter                                     │
│                                                             │
│ HIGH AVAILABILITY:                                          │
│ • Downtime = revenue loss                                  │
│ • 99.9% uptime expected                                    │
│ • Global audience, 24/7 usage                              │
│ • Graceful degradation required                            │
│                                                             │
│ DATA-DRIVEN:                                                │
│ • Usage analytics inform decisions                         │
│ • A/B testing is common                                    │
│ • User feedback loop is tight                              │
│ • Metrics define success                                   │
└─────────────────────────────────────────────────────────────┘

SaaS Metrics That Matter

KEY SAAS DEVELOPMENT METRICS:
┌─────────────────────────────────────────────────────────────┐
│                                                             │
│ FEATURE ADOPTION:                                           │
│ • What % of users use feature X?                           │
│ • Time to first use of new feature                         │
│ • Feature engagement over time                             │
│                                                             │
│ PRODUCT HEALTH:                                             │
│ • Error rate by feature                                    │
│ • Page load times                                          │
│ • API response times                                       │
│ • Support tickets by area                                  │
│                                                             │
│ USER SUCCESS:                                               │
│ • Activation rate (% completing key action)                │
│ • Retention by cohort                                      │
│ • NPS or satisfaction scores                               │
│ • Feature request patterns                                 │
│                                                             │
│ DEVELOPMENT VELOCITY:                                       │
│ • Deployment frequency                                     │
│ • Lead time (idea to production)                           │
│ • Change failure rate                                      │
│ • Time to recovery                                         │
│                                                             │
│ LINK TO PRIORITIZATION:                                     │
│ Features that improve these metrics → Higher priority     │
│ Features with unknown impact → Need validation             │
│ Features that don't move metrics → Question value          │
└─────────────────────────────────────────────────────────────┘

Development Workflow

Sprint Structure

SAAS SPRINT PATTERN:
┌─────────────────────────────────────────────────────────────┐
│                                                             │
│ 2-WEEK SPRINT ALLOCATION:                                   │
│                                                             │
│ [████████████████████████░░░░░░░░░░░░░░]                   │
│  │                      │             │                    │
│  │ Features 65%         │ Bugs 15%    │ Tech Debt 20%     │
│                                                             │
│ SPRINT RHYTHM:                                              │
│                                                             │
│ Day 1: Sprint Planning                                     │
│        • Review priorities                                 │
│        • Commit to sprint goals                            │
│        • Identify risks                                    │
│                                                             │
│ Days 2-9: Development                                      │
│        • Build features                                    │
│        • Deploy to staging                                 │
│        • Internal testing                                  │
│        • Ship when ready (continuous)                      │
│                                                             │
│ Day 10: Wrap-up                                            │
│        • Sprint demo                                       │
│        • Retrospective                                     │
│        • Metrics review                                    │
│                                                             │
│ CONTINUOUS THROUGHOUT:                                      │
│ • Bug triage (daily)                                       │
│ • Deployments (multiple per day)                           │
│ • Customer feedback review                                 │
│ • Metrics monitoring                                       │
└─────────────────────────────────────────────────────────────┘

Feature Development Flow

FEATURE LIFECYCLE:
┌─────────────────────────────────────────────────────────────┐
│                                                             │
│ 1. DISCOVERY                                                │
│    • Problem identified                                    │
│    • User research/feedback                                │
│    • Success metrics defined                               │
│    Duration: 1-2 weeks                                     │
│                                                             │
│ 2. DESIGN                                                   │
│    • Solution design                                       │
│    • Technical spec                                        │
│    • Stakeholder review                                    │
│    Duration: 1 week                                        │
│                                                             │
│ 3. DEVELOPMENT                                              │
│    • Build behind feature flag                             │
│    • Unit/integration tests                                │
│    • Code review                                           │
│    Duration: 1-3 sprints                                   │
│                                                             │
│ 4. INTERNAL TESTING                                         │
│    • Team dogfooding                                       │
│    • Bug fixes                                             │
│    • Performance validation                                │
│    Duration: 1-2 days                                      │
│                                                             │
│ 5. BETA ROLLOUT                                             │
│    • 5-10% of users                                        │
│    • Monitor metrics                                       │
│    • Collect feedback                                      │
│    Duration: 1 week                                        │
│                                                             │
│ 6. GENERAL AVAILABILITY                                     │
│    • 100% rollout                                          │
│    • Announcement                                          │
│    • Documentation                                         │
│    • Support training                                      │
│                                                             │
│ 7. ITERATION                                                │
│    • Monitor adoption                                      │
│    • Address feedback                                      │
│    • Improve based on data                                 │
│    Duration: Ongoing                                       │
└─────────────────────────────────────────────────────────────┘

Technical Practices

Feature Flags

FEATURE FLAG STRATEGY:
┌─────────────────────────────────────────────────────────────┐
│                                                             │
│ TYPES OF FLAGS:                                             │
│                                                             │
│ RELEASE FLAGS:                                              │
│ • Control feature visibility                               │
│ • Gradual rollout (1%, 10%, 50%, 100%)                    │
│ • Instant rollback capability                              │
│ Lifecycle: Remove after 100% rollout                      │
│                                                             │
│ EXPERIMENT FLAGS:                                           │
│ • A/B testing                                              │
│ • Measure impact                                           │
│ • Data-driven decisions                                    │
│ Lifecycle: Remove after decision                          │
│                                                             │
│ PERMISSION FLAGS:                                           │
│ • Plan-based features                                      │
│ • Enterprise-only features                                 │
│ • Beta program access                                      │
│ Lifecycle: Long-term                                       │
│                                                             │
│ OPS FLAGS:                                                  │
│ • Kill switches                                            │
│ • Degrade gracefully under load                           │
│ • Maintenance mode                                         │
│ Lifecycle: Permanent                                       │
│                                                             │
│ BEST PRACTICES:                                             │
│ • Name clearly (team_feature_variant)                     │
│ • Document each flag                                       │
│ • Track flag debt (remove old flags)                      │
│ • Never deploy flag-dependent without the flag            │
└─────────────────────────────────────────────────────────────┘

Deployment Strategy

SAAS DEPLOYMENT APPROACH:
┌─────────────────────────────────────────────────────────────┐
│                                                             │
│ CONTINUOUS DEPLOYMENT PIPELINE:                             │
│                                                             │
│ Push → CI Tests → Staging → Production                    │
│         │          │          │                            │
│       5 min      Auto       Auto or Manual                │
│                  deploy      deploy                        │
│                                                             │
│ DEPLOYMENT STAGES:                                          │
│                                                             │
│ 1. AUTOMATED TESTS                                          │
│    • Unit tests                                            │
│    • Integration tests                                     │
│    • Security scans                                        │
│    • Block on failure                                      │
│                                                             │
│ 2. STAGING DEPLOYMENT                                       │
│    • Automatic on main merge                               │
│    • Smoke tests run                                       │
│    • Manual verification optional                          │
│                                                             │
│ 3. PRODUCTION DEPLOYMENT                                    │
│    • Automatic or manual trigger                           │
│    • Canary deployment (small %)                          │
│    • Monitor error rates                                   │
│    • Auto-rollback on errors                               │
│                                                             │
│ 4. POST-DEPLOY VALIDATION                                   │
│    • Synthetic monitoring                                  │
│    • Error rate comparison                                 │
│    • Performance comparison                                │
│                                                             │
│ FREQUENCY:                                                  │
│ • Multiple deploys per day typical                        │
│ • Friday deploys: Be careful or skip                      │
│ • Smaller changes = lower risk                             │
└─────────────────────────────────────────────────────────────┘

Customer-Centric Development

Feedback Integration

CUSTOMER FEEDBACK LOOP:
┌─────────────────────────────────────────────────────────────┐
│                                                             │
│ FEEDBACK SOURCES:                                           │
│                                                             │
│ DIRECT:                                                     │
│ • Support tickets                                          │
│ • Feature requests                                         │
│ • Sales calls                                              │
│ • User interviews                                          │
│                                                             │
│ INDIRECT:                                                   │
│ • Usage analytics                                          │
│ • Error reports                                            │
│ • Churn reasons                                            │
│ • NPS comments                                             │
│                                                             │
│ PROCESSING FLOW:                                            │
│                                                             │
│ Feedback → Categorize → Prioritize → Build → Ship → Validate│
│                                                             │
│ CATEGORIZATION:                                             │
│ • Bug: Something is broken                                 │
│ • Feature: New capability requested                        │
│ • Improvement: Existing feature enhancement               │
│ • UX: Usability issue                                      │
│                                                             │
│ CLOSE THE LOOP:                                             │
│ • Tell customers when their feedback ships                 │
│ • "You asked, we built" communications                     │
│ • Builds trust and loyalty                                 │
│                                                             │
│ TRACKING IN GITSCRUM:                                       │
│ • Tag tasks with feedback source                           │
│ • Link to customer conversations                           │
│ • Track "customer-requested" vs internal                   │
└─────────────────────────────────────────────────────────────┘

Handling Customer Urgencies

CUSTOMER ESCALATION HANDLING:
┌─────────────────────────────────────────────────────────────┐
│                                                             │
│ NOT EVERY CUSTOMER REQUEST IS URGENT                        │
│                                                             │
│ TRIAGE FRAMEWORK:                                           │
│                                                             │
│ CRITICAL (Drop everything):                                │
│ • Production is down for many users                        │
│ • Data loss or security issue                              │
│ • Contractual obligation at risk                           │
│ Response: Immediately                                      │
│                                                             │
│ HIGH (This sprint):                                         │
│ • Major customer blocked                                   │
│ • Significant revenue at risk                              │
│ • Workaround difficult                                     │
│ Response: Within days                                      │
│                                                             │
│ MEDIUM (Backlog priority):                                  │
│ • Important to customer                                    │
│ • Workaround exists                                        │
│ • Affects workflow but not blocking                        │
│ Response: Prioritize in normal process                    │
│                                                             │
│ LOW (Backlog):                                              │
│ • Nice to have                                             │
│ • Single customer request                                  │
│ • Minor improvement                                        │
│ Response: Add to backlog, may not build                   │
│                                                             │
│ SAYING NO:                                                  │
│ "We hear you. This isn't prioritized currently because    │
│ [reason]. We'll revisit as priorities evolve."            │
│                                                             │
│ AVOID: Building for one customer at expense of all        │
└─────────────────────────────────────────────────────────────┘

Quality & Reliability

SaaS Quality Standards

QUALITY GATES FOR SAAS:
┌─────────────────────────────────────────────────────────────┐
│                                                             │
│ BEFORE MERGE:                                               │
│ ☐ Unit tests passing (>80% coverage on new code)          │
│ ☐ Integration tests passing                                │
│ ☐ Code review approved                                     │
│ ☐ Security scan passed                                     │
│ ☐ No console errors in browser                             │
│                                                             │
│ BEFORE PRODUCTION:                                          │
│ ☐ Staging smoke tests pass                                 │
│ ☐ Performance within bounds                                │
│ ☐ Feature flag configured correctly                        │
│ ☐ Monitoring/alerts set up                                 │
│ ☐ Rollback plan ready                                      │
│                                                             │
│ AFTER PRODUCTION:                                           │
│ ☐ Error rates normal                                       │
│ ☐ Performance metrics normal                               │
│ ☐ Feature adoption tracked                                 │
│ ☐ Support team informed                                    │
│                                                             │
│ ONGOING:                                                    │
│ • Uptime monitoring                                        │
│ • Performance monitoring                                   │
│ • Error tracking                                           │
│ • User feedback monitoring                                 │
│                                                             │
│ SLA TARGETS:                                                │
│ • 99.9% uptime                                             │
│ • <500ms API response (p95)                                │
│ • <3s page load                                            │
│ • <1% error rate                                           │
└─────────────────────────────────────────────────────────────┘