Sprint Planning Best Practices
Sprint planning is where strategy meets execution. A good planning session produces achievable commitments, clear goals, and a team that knows exactly what to build. A bad one creates overcommitment, confusion, and sprint failure before it starts.
Planning Problems
| Problem | Cause | Solution |
|---|---|---|
| Takes forever | Ungroomed backlog | Refine before planning |
| Overcommitment | No capacity math | Calculate capacity |
| Unclear work | Vague requirements | Groom with acceptance criteria |
| No focus | Too much variety | Clear sprint goal |
| Task dumping | No team input | Collaborative planning |
Preparation
Before the Meeting
SPRINT PLANNING PREPARATION
═══════════════════════════
PRODUCT OWNER PREP:
─────────────────────────────────────
□ Backlog groomed and prioritized
□ Top items have:
├── Clear acceptance criteria
├── Estimates (from refinement)
├── Dependencies identified
└── Questions resolved
□ Priority clear for top 150% of capacity
□ Sprint goal drafted
□ Stakeholder input gathered
SCRUM MASTER PREP:
─────────────────────────────────────
□ Previous sprint data reviewed
├── Velocity average
├── Completion rate
└── Issues to address
□ Capacity calculated
├── Team availability
├── PTO noted
├── Other commitments
□ Meeting scheduled and rooms booked
□ Tools ready (GitScrum, projector)
□ Timeboxes planned
TEAM PREP:
─────────────────────────────────────
□ Previous sprint work completed or handed off
□ Questions about top backlog items noted
□ Technical considerations identified
□ Ready to commit
IF NOT PREPARED:
─────────────────────────────────────
Don't plan. Prep first.
Bad planning = failed sprint.
2 hours of prep saves 4 hours in meeting.
Capacity Calculation
CAPACITY BEFORE PLANNING
════════════════════════
CALCULATE AVAILABLE CAPACITY:
─────────────────────────────────────
Sprint: 2 weeks (10 working days)
PERSON AVAILABILITY:
────────────────────────────────────────────────────
Person Days Out Days Available Focus Factor
────────────────────────────────────────────────────
Sarah 0 10 80%
Mike 2 PTO 8 75%
Alex 1 training 9 75%
Emma 0 10 80%
────────────────────────────────────────────────────
CAPACITY CALCULATION:
├── Sarah: 10 × 5.5h × 0.80 = 44h → 11 pts
├── Mike: 8 × 5.5h × 0.75 = 33h → 8 pts
├── Alex: 9 × 5.5h × 0.75 = 37h → 9 pts
├── Emma: 10 × 5.5h × 0.80 = 44h → 11 pts
└── TOTAL: 39 points capacity
WITH BUFFER:
├── Calculated: 39 points
├── Buffer (10%): -4 points
├── Commit to: 35 points
└── Stretch: 35-39 points
The Meeting
Part 1: Goals and Priorities
PLANNING PART 1 (30-45 min)
═══════════════════════════
SPRINT GOAL:
─────────────────────────────────────
PO presents:
"This sprint, our goal is to complete
user authentication so we can begin
user testing next sprint."
Why this matters:
├── User testing blocked without auth
├── Critical path for Q1 release
├── Customer committed demo on [date]
└── Questions?
DISCUSS GOAL:
├── Team understands the why
├── Questions answered
├── Goal refined if needed
├── Everyone aligned on priority
PRIORITY STACK:
─────────────────────────────────────
"To achieve this goal, here are the items
in priority order:
1. GS-100: Login implementation (8 pts)
2. GS-101: Password reset (5 pts)
3. GS-102: OAuth integration (8 pts)
4. GS-103: Session management (5 pts)
5. GS-104: Remember me (3 pts)
------- Sprint goal items above -------
6. GS-105: Security audit (5 pts)
7. GS-106: Bug fixes (4 pts)
We have 35 points capacity.
Items 1-4 = 26 points = goal achievable
Items 5-6 = stretch if capacity allows"
STAKEHOLDER EXIT:
─────────────────────────────────────
After Part 1, stakeholders leave.
Team owns the "how" in Part 2.
Part 2: Detailed Planning
PLANNING PART 2 (60-90 min)
═══════════════════════════
ITEM BY ITEM:
─────────────────────────────────────
For each item:
1. PO PRESENTS CONTEXT
"GS-100: Login implementation.
Users enter email/password.
Acceptance criteria are..."
2. TEAM DISCUSSES APPROACH
"We'll use JWT tokens"
"Frontend form + backend validation"
"Need to integrate with existing user model"
3. TEAM BREAKS DOWN IF NEEDED
"Let's split this:
- Backend API (3 pts)
- Frontend form (3 pts)
- Integration + testing (2 pts)"
4. TEAM ESTIMATES/CONFIRMS
"Still 8 points total? Yes."
5. TEAM ASSIGNS (or decides later)
"Sarah on backend, Mike on frontend"
CONTINUE UNTIL CAPACITY:
├── Work through priority order
├── Track points committed
├── Stop at capacity
├── Don't exceed even for "one more thing"
IDENTIFY DEPENDENCIES:
─────────────────────────────────────
"GS-101 needs GS-100's auth endpoint.
Sarah, can you have that done by Day 3?"
"GS-102 needs OAuth keys from platform team.
We'll follow up today. If not by Day 2, at risk."
Commitment
FINALIZING THE SPRINT
═════════════════════
REVIEW COMMITMENT:
─────────────────────────────────────
Sprint 26 Commitment:
├── Goal: Complete user authentication
├── Capacity: 35 points
├── Committed: 33 points
Items:
├── GS-100: Login (8 pts) - Sarah/Mike
├── GS-101: Password reset (5 pts) - Alex
├── GS-102: OAuth (8 pts) - Sarah
├── GS-103: Session mgmt (5 pts) - Mike
├── GS-104: Remember me (3 pts) - Emma
└── GS-106: Bug fixes (4 pts) - Emma
Stretch (if ahead):
├── GS-105: Security audit (5 pts)
TEAM CONFIRMATION:
─────────────────────────────────────
"Looking at this list, is this achievable
in the next two weeks?"
Each person speaks:
├── Sarah: "Yes, I'm good"
├── Mike: "Concerned about OAuth timing"
├── Alex: "All set"
├── Emma: "Yes"
RESOLVE CONCERNS:
"Mike, what would help with OAuth timing?"
"If we get keys by Day 2, we're fine."
"Let's make that Day 1 action item."
COMMIT:
"We're committing to this sprint. Let's go!"
Common Pitfalls
Avoiding Problems
SPRINT PLANNING PITFALLS
════════════════════════
PITFALL: OVERCOMMITMENT
─────────────────────────────────────
Symptom: Always spilling work to next sprint
Cause: Planning to 100% capacity
Fix:
├── Calculate real capacity
├── Apply focus factor
├── Include buffer
├── Track and improve accuracy
└── Under-promise, over-deliver
PITFALL: VAGUE ITEMS
─────────────────────────────────────
Symptom: "What does this mean?" in planning
Cause: Skipping refinement
Fix:
├── Groom before planning
├── Acceptance criteria required
├── Questions answered in refinement
├── Definition of Ready
└── If not clear, don't commit
PITFALL: NO SPRINT GOAL
─────────────────────────────────────
Symptom: Random assortment of work
Cause: No focus from PO
Fix:
├── Require sprint goal
├── Items connect to goal
├── Trade-offs favor goal items
├── Success = goal achieved
└── Not just "finish X points"
PITFALL: MANAGER ASSIGNS
─────────────────────────────────────
Symptom: Team told what to do
Cause: Top-down culture
Fix:
├── Team pulls work
├── Team self-organizes
├── PO sets priorities (what)
├── Team decides approach (how)
└── Ownership = motivation
GitScrum for Planning
Planning Features
GITSCRUM SPRINT PLANNING
════════════════════════
BACKLOG VIEW:
─────────────────────────────────────
Planning → Backlog
├── Prioritized list
├── Points visible
├── Drag to sprint
├── Running total
└── Capacity indicator
SPRINT CREATION:
─────────────────────────────────────
├── Set sprint dates
├── Define sprint goal
├── Set capacity (manual or calculated)
├── Track committed vs. capacity
└── Start sprint when ready
CAPACITY TRACKING:
─────────────────────────────────────
┌─────────────────────────────────────────────────────────┐
│ Sprint 26 │
├─────────────────────────────────────────────────────────┤
│ Goal: Complete user authentication │
│ │
│ Capacity: 35 pts │
│ Committed: 33 pts │
│ Buffer: 2 pts (6%) │
│ │
│ ████████████████████████████████░░ 94% │
│ │
│ Status: ✓ Good commitment level │
│ │
└─────────────────────────────────────────────────────────┘
ASSIGNMENTS:
─────────────────────────────────────
In planning:
├── Assign owners to items
├── See workload balance
├── Adjust if uneven
└── Everyone has clear work
Best Practices
For Sprint Planning
- Groom before planning — 80% prep, 20% planning
- Set sprint goal — Focus, not feature list
- Calculate capacity — Realistic availability
- Team commits — Not manager assigns
- Timebox ruthlessly — 2-4 hours max
Anti-Patterns
PLANNING MISTAKES:
✗ Ungroomed backlog in planning
✗ No capacity calculation
✗ Always overcommitting
✗ No sprint goal
✗ Manager assigns work
✗ Planning takes all day
✗ Same items every sprint (never done)
✗ No team input on approach