Sprint Planning Best Practices

Sprint planning is where strategy meets execution. A good planning session produces achievable commitments, clear goals, and a team that knows exactly what to build. A bad one creates overcommitment, confusion, and sprint failure before it starts.

Planning Problems

ProblemCauseSolution
Takes foreverUngroomed backlogRefine before planning
OvercommitmentNo capacity mathCalculate capacity
Unclear workVague requirementsGroom with acceptance criteria
No focusToo much varietyClear sprint goal
Task dumpingNo team inputCollaborative planning

Preparation

Before the Meeting

SPRINT PLANNING PREPARATION
═══════════════════════════

PRODUCT OWNER PREP:
─────────────────────────────────────
□ Backlog groomed and prioritized
□ Top items have:
  ├── Clear acceptance criteria
  ├── Estimates (from refinement)
  ├── Dependencies identified
  └── Questions resolved
□ Priority clear for top 150% of capacity
□ Sprint goal drafted
□ Stakeholder input gathered

SCRUM MASTER PREP:
─────────────────────────────────────
□ Previous sprint data reviewed
  ├── Velocity average
  ├── Completion rate
  └── Issues to address
□ Capacity calculated
  ├── Team availability
  ├── PTO noted
  ├── Other commitments
□ Meeting scheduled and rooms booked
□ Tools ready (GitScrum, projector)
□ Timeboxes planned

TEAM PREP:
─────────────────────────────────────
□ Previous sprint work completed or handed off
□ Questions about top backlog items noted
□ Technical considerations identified
□ Ready to commit

IF NOT PREPARED:
─────────────────────────────────────
Don't plan. Prep first.
Bad planning = failed sprint.
2 hours of prep saves 4 hours in meeting.

Capacity Calculation

CAPACITY BEFORE PLANNING
════════════════════════

CALCULATE AVAILABLE CAPACITY:
─────────────────────────────────────
Sprint: 2 weeks (10 working days)

PERSON AVAILABILITY:
────────────────────────────────────────────────────
Person    Days Out    Days Available    Focus Factor
────────────────────────────────────────────────────
Sarah       0            10               80%
Mike        2 PTO         8               75%
Alex        1 training    9               75%
Emma        0            10               80%
────────────────────────────────────────────────────

CAPACITY CALCULATION:
├── Sarah: 10 × 5.5h × 0.80 = 44h → 11 pts
├── Mike: 8 × 5.5h × 0.75 = 33h → 8 pts
├── Alex: 9 × 5.5h × 0.75 = 37h → 9 pts
├── Emma: 10 × 5.5h × 0.80 = 44h → 11 pts
└── TOTAL: 39 points capacity

WITH BUFFER:
├── Calculated: 39 points
├── Buffer (10%): -4 points
├── Commit to: 35 points
└── Stretch: 35-39 points

The Meeting

Part 1: Goals and Priorities

PLANNING PART 1 (30-45 min)
═══════════════════════════

SPRINT GOAL:
─────────────────────────────────────
PO presents:
"This sprint, our goal is to complete
user authentication so we can begin
user testing next sprint."

Why this matters:
├── User testing blocked without auth
├── Critical path for Q1 release
├── Customer committed demo on [date]
└── Questions?

DISCUSS GOAL:
├── Team understands the why
├── Questions answered
├── Goal refined if needed
├── Everyone aligned on priority

PRIORITY STACK:
─────────────────────────────────────
"To achieve this goal, here are the items
in priority order:

1. GS-100: Login implementation (8 pts)
2. GS-101: Password reset (5 pts)
3. GS-102: OAuth integration (8 pts)
4. GS-103: Session management (5 pts)
5. GS-104: Remember me (3 pts)
------- Sprint goal items above -------
6. GS-105: Security audit (5 pts)
7. GS-106: Bug fixes (4 pts)

We have 35 points capacity.
Items 1-4 = 26 points = goal achievable
Items 5-6 = stretch if capacity allows"

STAKEHOLDER EXIT:
─────────────────────────────────────
After Part 1, stakeholders leave.
Team owns the "how" in Part 2.

Part 2: Detailed Planning

PLANNING PART 2 (60-90 min)
═══════════════════════════

ITEM BY ITEM:
─────────────────────────────────────
For each item:

1. PO PRESENTS CONTEXT
   "GS-100: Login implementation.
   Users enter email/password.
   Acceptance criteria are..."

2. TEAM DISCUSSES APPROACH
   "We'll use JWT tokens"
   "Frontend form + backend validation"
   "Need to integrate with existing user model"

3. TEAM BREAKS DOWN IF NEEDED
   "Let's split this:
   - Backend API (3 pts)
   - Frontend form (3 pts)
   - Integration + testing (2 pts)"

4. TEAM ESTIMATES/CONFIRMS
   "Still 8 points total? Yes."

5. TEAM ASSIGNS (or decides later)
   "Sarah on backend, Mike on frontend"

CONTINUE UNTIL CAPACITY:
├── Work through priority order
├── Track points committed
├── Stop at capacity
├── Don't exceed even for "one more thing"

IDENTIFY DEPENDENCIES:
─────────────────────────────────────
"GS-101 needs GS-100's auth endpoint.
Sarah, can you have that done by Day 3?"

"GS-102 needs OAuth keys from platform team.
We'll follow up today. If not by Day 2, at risk."

Commitment

FINALIZING THE SPRINT
═════════════════════

REVIEW COMMITMENT:
─────────────────────────────────────
Sprint 26 Commitment:
├── Goal: Complete user authentication
├── Capacity: 35 points
├── Committed: 33 points

Items:
├── GS-100: Login (8 pts) - Sarah/Mike
├── GS-101: Password reset (5 pts) - Alex
├── GS-102: OAuth (8 pts) - Sarah
├── GS-103: Session mgmt (5 pts) - Mike
├── GS-104: Remember me (3 pts) - Emma
└── GS-106: Bug fixes (4 pts) - Emma

Stretch (if ahead):
├── GS-105: Security audit (5 pts)

TEAM CONFIRMATION:
─────────────────────────────────────
"Looking at this list, is this achievable
in the next two weeks?"

Each person speaks:
├── Sarah: "Yes, I'm good"
├── Mike: "Concerned about OAuth timing"
├── Alex: "All set"
├── Emma: "Yes"

RESOLVE CONCERNS:
"Mike, what would help with OAuth timing?"
"If we get keys by Day 2, we're fine."
"Let's make that Day 1 action item."

COMMIT:
"We're committing to this sprint. Let's go!"

Common Pitfalls

Avoiding Problems

SPRINT PLANNING PITFALLS
════════════════════════

PITFALL: OVERCOMMITMENT
─────────────────────────────────────
Symptom: Always spilling work to next sprint
Cause: Planning to 100% capacity

Fix:
├── Calculate real capacity
├── Apply focus factor
├── Include buffer
├── Track and improve accuracy
└── Under-promise, over-deliver

PITFALL: VAGUE ITEMS
─────────────────────────────────────
Symptom: "What does this mean?" in planning
Cause: Skipping refinement

Fix:
├── Groom before planning
├── Acceptance criteria required
├── Questions answered in refinement
├── Definition of Ready
└── If not clear, don't commit

PITFALL: NO SPRINT GOAL
─────────────────────────────────────
Symptom: Random assortment of work
Cause: No focus from PO

Fix:
├── Require sprint goal
├── Items connect to goal
├── Trade-offs favor goal items
├── Success = goal achieved
└── Not just "finish X points"

PITFALL: MANAGER ASSIGNS
─────────────────────────────────────
Symptom: Team told what to do
Cause: Top-down culture

Fix:
├── Team pulls work
├── Team self-organizes
├── PO sets priorities (what)
├── Team decides approach (how)
└── Ownership = motivation

GitScrum for Planning

Planning Features

GITSCRUM SPRINT PLANNING
════════════════════════

BACKLOG VIEW:
─────────────────────────────────────
Planning → Backlog
├── Prioritized list
├── Points visible
├── Drag to sprint
├── Running total
└── Capacity indicator

SPRINT CREATION:
─────────────────────────────────────
├── Set sprint dates
├── Define sprint goal
├── Set capacity (manual or calculated)
├── Track committed vs. capacity
└── Start sprint when ready

CAPACITY TRACKING:
─────────────────────────────────────
┌─────────────────────────────────────────────────────────┐
│  Sprint 26                                             │
├─────────────────────────────────────────────────────────┤
│  Goal: Complete user authentication                    │
│                                                         │
│  Capacity: 35 pts                                      │
│  Committed: 33 pts                                     │
│  Buffer: 2 pts (6%)                                    │
│                                                         │
│  ████████████████████████████████░░ 94%                │
│                                                         │
│  Status: ✓ Good commitment level                       │
│                                                         │
└─────────────────────────────────────────────────────────┘

ASSIGNMENTS:
─────────────────────────────────────
In planning:
├── Assign owners to items
├── See workload balance
├── Adjust if uneven
└── Everyone has clear work

Best Practices

For Sprint Planning

  1. Groom before planning — 80% prep, 20% planning
  2. Set sprint goal — Focus, not feature list
  3. Calculate capacity — Realistic availability
  4. Team commits — Not manager assigns
  5. Timebox ruthlessly — 2-4 hours max

Anti-Patterns

PLANNING MISTAKES:
✗ Ungroomed backlog in planning
✗ No capacity calculation
✗ Always overcommitting
✗ No sprint goal
✗ Manager assigns work
✗ Planning takes all day
✗ Same items every sprint (never done)
✗ No team input on approach