4 min read • Guide 289 of 877
Best Kanban Software for Software Development
Kanban works for software development when the tool understands code workflow. GitScrum's Kanban implementation includes developer-specific features—WIP limits, column automation, Git integration, and visual flow—creating the pull-based system that keeps development teams productive.
Kanban for Development
Why Developers Love Kanban
KANBAN DEVELOPMENT FIT:
┌─────────────────────────────────────────────────────────────┐
│ KANBAN PRINCIPLES FOR CODE │
├─────────────────────────────────────────────────────────────┤
│ │
│ VISUAL WORKFLOW: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ • See all work in progress ││
│ │ • Identify bottlenecks immediately ││
│ │ • Track flow from idea to production ││
│ │ • Match mental model of development ││
│ └─────────────────────────────────────────────────────────┘│
│ │
│ WIP LIMITS: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ • Stop starting, start finishing ││
│ │ • Reduce context switching ││
│ │ • Expose capacity constraints ││
│ │ • Improve flow and throughput ││
│ └─────────────────────────────────────────────────────────┘│
│ │
│ PULL SYSTEM: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ • Developers pull work when ready ││
│ │ • No push-based overload ││
│ │ • Natural capacity matching ││
│ │ • Sustainable pace ││
│ └─────────────────────────────────────────────────────────┘│
│ │
└─────────────────────────────────────────────────────────────┘
Essential Kanban Features
What to Look For
| Feature | Purpose |
|---|---|
| WIP limits | Prevent overload |
| Swimlanes | Organize by type/team |
| Column policies | Define "done" criteria |
| Cycle time | Measure flow |
| Blockers | Surface stuck work |
GitScrum Kanban Features
Developer-Optimized Board
GITSCRUM KANBAN CAPABILITIES:
┌─────────────────────────────────────────────────────────────┐
│ DEVELOPER-FOCUSED KANBAN │
├─────────────────────────────────────────────────────────────┤
│ │
│ WIP LIMITS: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ • Set 1-15 tasks per column ││
│ │ • Enforced on drag (can't exceed) ││
│ │ • Visual warning when approaching ││
│ │ • Column-by-column configuration ││
│ └─────────────────────────────────────────────────────────┘│
│ │
│ COLUMN AUTOMATION: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ • Auto-assign when entering column ││
│ │ • Auto-label based on column ││
│ │ • Email notifications to subscribers ││
│ │ • Auto-archive old completed tasks ││
│ └─────────────────────────────────────────────────────────┘│
│ │
│ FLOW VISIBILITY: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ • Cumulative Flow Diagram in Reports ││
│ │ • Project Age Analysis (stagnant detection) ││
│ │ • Weekly Activity Heatmap ││
│ │ • Blocker tracking with duration ││
│ └─────────────────────────────────────────────────────────┘│
│ │
│ DEVELOPER EXPERIENCE: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ • Dark mode default ││
│ │ • Fast, smooth drag-and-drop ││
│ │ • Git integration built-in ││
│ │ • Minimal UI, maximum focus ││
│ └─────────────────────────────────────────────────────────┘│
│ │
└─────────────────────────────────────────────────────────────┘
Board Configuration
Development Team Board
| Column | WIP Limit | Automation |
|---|---|---|
| Backlog | None | - |
| Ready | 10 | Add "ready" label |
| Development | 4 | Auto-assign dev team |
| Review | 3 | Notify reviewers |
| Testing | 5 | Add "testing" label |
| Done | None | Auto-archive 7 days |
Measuring Flow
Kanban Metrics
- Lead time - Idea to production
- Cycle time - Start to finish
- Throughput - Tasks completed per week
- WIP age - How long in progress
- Blocker time - Time spent stuck