5 min read • Guide 622 of 877
Agile Workflow Optimization
Optimizing agile workflows requires continuous attention to how work flows through your system and where delays occur. GitScrum's analytics, board customization, and automation features help teams identify improvement opportunities, implement changes, and measure the impact of workflow optimizations on delivery speed and quality.
Understanding Your Current Flow
Measuring Flow Metrics
KEY WORKFLOW METRICS:
┌─────────────────────────────────────────────────────────────┐
│ METRIC │ WHAT IT TELLS YOU │
├─────────────────────┼───────────────────────────────────────┤
│ Cycle Time │ How long from start to done │
│ │ Lower = faster delivery │
├─────────────────────┼───────────────────────────────────────┤
│ Lead Time │ How long from request to delivery │
│ │ Measures total customer wait time │
├─────────────────────┼───────────────────────────────────────┤
│ Throughput │ How many items completed per period │
│ │ Higher = more delivery capacity │
├─────────────────────┼───────────────────────────────────────┤
│ WIP Age │ How long items sit in progress │
│ │ High age = stalled work │
├─────────────────────┼───────────────────────────────────────┤
│ Flow Efficiency │ Active time vs total time │
│ │ Low = too much waiting │
└─────────────────────────────────────────────────────────────┘
Identifying Bottlenecks
BOTTLENECK DETECTION:
┌─────────────────────────────────────────────────────────────┐
│ │
│ COLUMN WIP: │ 3 │ │ 2 │ │ 8 │ │ 1 │ │ 12│ │
│ │ │ │ │ │ │ │ │ │ │ │
│ STATUS: │To │ │Dev│ │Rev│ │QA │ │Done │
│ │Do │ │ │ │iew│ │ │ │ │ │
│ ↑ │
│ BOTTLENECK │
│ (High WIP, slow flow) │
│ │
│ SIGNS OF BOTTLENECK: │
│ • Work piles up in one column │
│ • Long average time in that stage │
│ • Downstream stages starved for work │
│ • Team members idle waiting │
└─────────────────────────────────────────────────────────────┘
Optimization Strategies
Reduce Batch Sizes
BATCH SIZE IMPACT:
┌─────────────────────────────────────────────────────────────┐
│ LARGE BATCHES: │
│ ┌────────────────────────────────────────┐ │
│ │ Feature A (2 weeks) │───────→ Release │
│ └────────────────────────────────────────┘ (slow) │
│ │
│ SMALL BATCHES: │
│ ┌─────┐ ┌─────┐ ┌─────┐ ┌─────┐ │
│ │ A.1 │→│ A.2 │→│ A.3 │→│ A.4 │──→ Releases (fast) │
│ └─────┘ └─────┘ └─────┘ └─────┘ │
│ │
│ BENEFITS OF SMALLER BATCHES: │
│ • Faster feedback │
│ • Lower risk per release │
│ • More flexibility to change direction │
│ • Easier code reviews │
└─────────────────────────────────────────────────────────────┘
Limit Work in Progress
WIP LIMIT OPTIMIZATION:
┌─────────────────────────────────────────────────────────────┐
│ │
│ FINDING THE RIGHT WIP LIMIT: │
│ │
│ Start with: (Team members × 1.5) rounded up │
│ │
│ 4 developers → WIP limit of 6 │
│ │
│ ADJUST BASED ON: │
│ Too Low (starving): │ Too High (chaos): │
│ • Idle team members │ • Constant context switching │
│ • Work finishes fast │ • High WIP age │
│ • Throughput drops │ • Nothing actually finishes │
│ │ │
│ → Increase limit │ → Decrease limit │
└─────────────────────────────────────────────────────────────┘
Automate Handoffs
GITSCRUM AUTOMATION RULES:
┌─────────────────────────────────────────────────────────────┐
│ TRIGGER │ ACTION │
├──────────────────────┼──────────────────────────────────────┤
│ PR merged │ Move task to "Testing" │
│ All subtasks done │ Move parent to "Review" │
│ QA approved │ Move to "Done" │
│ High priority added │ Notify team lead │
│ Task stale 3 days │ Add "needs-attention" label │
│ Sprint ends │ Move incomplete to backlog │
└─────────────────────────────────────────────────────────────┘
Automation eliminates manual handoff delays
and ensures consistent process execution
Continuous Improvement
Retrospective-Driven Optimization
WORKFLOW RETROSPECTIVE FOCUS:
┌─────────────────────────────────────────────────────────────┐
│ │
│ EACH RETROSPECTIVE, ANALYZE: │
│ │
│ 1. WHERE DID WORK GET STUCK? │
│ └── Look at cycle time per stage │
│ │
│ 2. WHAT CAUSED DELAYS? │
│ └── External deps? Reviews? Unclear requirements? │
│ │
│ 3. WHAT DID WE AUTOMATE/IMPROVE? │
│ └── Did it have the expected impact? │
│ │
│ PICK ONE IMPROVEMENT per retrospective │
│ Measure impact before picking next one │
└─────────────────────────────────────────────────────────────┘
A/B Testing Workflow Changes
TESTING WORKFLOW CHANGES:
┌─────────────────────────────────────────────────────────────┐
│ │
│ Week 1-2: BASELINE │
│ • Measure current cycle time │
│ • Note throughput and quality │
│ • Document current process │
│ │
│ Week 3-4: EXPERIMENT │
│ • Implement one workflow change │
│ • Same team, same work type │
│ • Measure same metrics │
│ │
│ Week 5: EVALUATE │
│ • Compare metrics │
│ • Keep change if improved │
│ • Roll back if worse │
│ • Try different change if neutral │
└─────────────────────────────────────────────────────────────┘
Common Optimizations
High-Impact Changes
OPTIMIZATION PRIORITY:
┌─────────────────────────────────────────────────────────────┐
│ HIGHEST IMPACT (do first): │
│ ✅ Reduce code review turnaround time │
│ ✅ Automate deployment process │
│ ✅ Add WIP limits to bottleneck column │
│ │
│ MEDIUM IMPACT: │
│ ○ Improve requirement clarity │
│ ○ Add automated testing │
│ ○ Streamline environment setup │
│ │
│ LOWER IMPACT (do later): │
│ ○ Optimize meeting schedules │
│ ○ Standardize documentation │
│ ○ Refine estimation process │
└─────────────────────────────────────────────────────────────┘