Handling Cross-Functional Teams
Cross-functional teams require coordination across different disciplines with varying workflows and tools. GitScrum's flexible board configurations, role-based views, and unified project spaces help designers, developers, QA, and product managers collaborate seamlessly while maintaining their specialized workflows.
Cross-Functional Team Structure
| Role | Contribution | Sprint Involvement |
|---|---|---|
| Product Owner | Requirements, priorities | Planning, review |
| Designer | UX/UI designs | Design ahead, review |
| Developer | Implementation | Entire sprint |
| QA | Testing, quality | Review, testing phase |
| DevOps | Deployment, infrastructure | As needed |
Workflow Coordination
STAGGERED WORKFLOW APPROACH
Sprint N-1 │ Sprint N │ Sprint N+1
│ │
Design: [Feature C] │ [Feature D] │ [Feature E]
Designing │ Designing │ Designing
↓ │ ↓ │
Dev: │ [Feature C] │ [Feature D]
│ Building │ Building
│ ↓ │
QA: │ │ [Feature C]
│ │ Testing
BENEFIT: Each role has work in their sprint
No waiting for handoffs within sprint
Visualizing Cross-Functional Work
SWIMLANE VIEW BY ROLE
┌─────────────────────────────────────────────────────────┐
│ Sprint 12 Board │
├─────────────────────────────────────────────────────────┤
│ To Do In Progress Review Done │
├─────────────────────────────────────────────────────────┤
│ Design │ [F5 UI] │ [F4 Review] │ │ [F3 Done]│
│ │ │ │ │ │
├─────────────────────────────────────────────────────────┤
│ Dev │ [F4 API] │ [F3 Build] │ [F3 PR] │ [F2 Done]│
│ │ │ [F3 Front] │ │ │
├─────────────────────────────────────────────────────────┤
│ QA │ [F2 Test]│ [F2 Auto] │ │ [F1 Done]│
│ │ │ │ │ │
└─────────────────────────────────────────────────────────┘
Each role can see their pipeline
Bottlenecks visible by swimlane fullness
Capacity Planning by Role
CROSS-FUNCTIONAL CAPACITY PLANNING
Sprint 12 Capacity (in story points or days):
┌─────────────────────────────────────────────────┐
│ Role Capacity Planned Available │
│ ───────────────────────────────────────────── │
│ Design 20 pts 18 pts 2 pts │
│ Frontend 40 pts 38 pts 2 pts │
│ Backend 40 pts 35 pts 5 pts │
│ QA 25 pts 25 pts 0 pts ⚠️ │
│ DevOps 10 pts 8 pts 2 pts │
│ ───────────────────────────────────────────── │
│ Total 135 pts 124 pts │
└─────────────────────────────────────────────────┘
ISSUE IDENTIFIED: QA at full capacity
ACTION: Developers help with test automation
Handoff Process
DEFINITION OF DONE FOR HANDOFFS
DESIGN → DEVELOPMENT HANDOFF:
┌─────────────────────────────────────────────────┐
│ ☑ Final designs in Figma (linked to task) │
│ ☑ All states designed (empty, error, loading) │
│ ☑ Mobile responsive specs included │
│ ☑ Design system components identified │
│ ☑ Designer available for questions │
│ ☑ Acceptance criteria updated │
└─────────────────────────────────────────────────┘
DEVELOPMENT → QA HANDOFF:
┌─────────────────────────────────────────────────┐
│ ☑ Code complete and code reviewed │
│ ☑ Unit tests passing │
│ ☑ Deployed to staging environment │
│ ☑ Test scenarios documented │
│ ☑ Known issues documented │
│ ☑ Developer available for bug fixes │
└─────────────────────────────────────────────────┘
QA → RELEASE HANDOFF:
┌─────────────────────────────────────────────────┐
│ ☑ All test cases executed │
│ ☑ No P1/P2 bugs outstanding │
│ ☑ Regression testing complete │
│ ☑ Performance verified │
│ ☑ Sign-off documented │
└─────────────────────────────────────────────────┘
Best Practices
- Plan work in advance so each role has work ready
- Stagger by one sprint between disciplines
- Visualize by role to spot bottlenecks
- Daily standup includes all roles for sync
- Cross-train for flexibility when roles blocked
- Clear handoff criteria reduce back-and-forth
- Shared retrospectives improve whole process
- Rotate pairing between disciplines
Anti-Patterns
✗ All design in sprint 1, all dev in sprint 2
✗ QA only involved at end (bug flood)
✗ Roles not communicating until handoff
✗ No flexibility between role boundaries
✗ Separate standups per discipline
✗ Blaming other roles for delays