9 min read • Guide 580 of 877
Remote Team Best Practices
Remote teams can be just as productive as co-located teams—often more so—when equipped with the right practices and tools. GitScrum provides the async-first workflows, transparent visibility, and collaborative features that remote development teams need to succeed without requiring constant video calls. The key is intentional communication and trust-based management.
Remote Work Modes
| Mode | Best For | Challenges |
|---|---|---|
| Fully Remote | Global talent, flexibility | Culture, coordination |
| Hybrid | Balance of both | Equity between remote/office |
| Remote-First | Intentional remote culture | Office may feel secondary |
| Distributed | Teams across locations | Timezone complexity |
Communication Framework
ASYNC-FIRST COMMUNICATION
ASYNC VS SYNC DECISION:
┌─────────────────────────────────────────────────┐
│ USE ASYNC FOR: │
│ ├── Status updates │
│ ├── Code reviews │
│ ├── Documentation │
│ ├── Non-urgent decisions │
│ ├── Information sharing │
│ └── Work that needs deep focus │
│ │
│ USE SYNC FOR: │
│ ├── Complex problem-solving │
│ ├── Relationship building │
│ ├── Sensitive conversations │
│ ├── Brainstorming sessions │
│ ├── Urgent issues │
│ └── Onboarding new team members │
└─────────────────────────────────────────────────┘
ASYNC COMMUNICATION PRINCIPLES:
┌─────────────────────────────────────────────────┐
│ 1. Write clearly and completely │
│ └── Include context—reader may be in │
│ different timezone with no way to ask │
│ │
│ 2. Set expectations for response time │
│ ├── Urgent: Same day │
│ ├── Normal: 24 hours │
│ └── Low: 48-72 hours │
│ │
│ 3. Use the right channel │
│ ├── Ephemeral: Chat (Slack) │
│ ├── Persistent: Docs (Confluence) │
│ └── Discussion: Comments (GitScrum) │
│ │
│ 4. Document decisions │
│ └── Conclusions must be written down │
└─────────────────────────────────────────────────┘
Meeting Optimization
REMOTE MEETING PRACTICES
MEETING GUIDELINES:
┌─────────────────────────────────────────────────┐
│ Before Meeting: │
│ ├── Question: Could this be async? │
│ ├── Share agenda in advance │
│ ├── Include pre-read materials │
│ └── Confirm attendees really need to be there │
│ │
│ During Meeting: │
│ ├── Start and end on time │
│ ├── Cameras on when possible │
│ ├── One person talks at a time │
│ ├── Use chat for questions │
│ └── Designate note-taker │
│ │
│ After Meeting: │
│ ├── Share notes immediately │
│ ├── Document decisions and action items │
│ └── Follow up on action items │
└─────────────────────────────────────────────────┘
TIMEZONE-FRIENDLY SCHEDULING:
┌─────────────────────────────────────────────────┐
│ Team Spread: US West + US East + EU │
│ │
│ Overlap hours: │
│ ├── US West: 9 AM - 12 PM (PST) │
│ ├── US East: 12 PM - 3 PM (EST) │
│ └── EU: 5 PM - 8 PM (CET) │
│ │
│ Core meeting window: 9-11 AM PST │
│ (12-2 PM EST, 6-8 PM CET) │
│ │
│ Rotate inconvenient times: │
│ └── Alternate early/late for fairness │
│ │
│ Record important meetings: │
│ └── Those who can't attend watch recording │
└─────────────────────────────────────────────────┘
Remote Team Rituals
TEAM RITUALS FOR CONNECTION
DAILY TOUCHPOINTS:
┌─────────────────────────────────────────────────┐
│ Async Standup: │
│ ├── Posted in team channel by start of day │
│ ├── Format: Yesterday / Today / Blockers │
│ ├── Thread for questions and help offers │
│ └── No meeting needed for small teams │
│ │
│ Sync Standup (if needed): │
│ ├── 15 minutes max │
│ ├── Video on for connection │
│ └── Focus on blockers, not status reports │
└─────────────────────────────────────────────────┘
WEEKLY RITUALS:
┌─────────────────────────────────────────────────┐
│ Team Meeting (weekly, 60 min): │
│ ├── 10 min: Wins and celebrations │
│ ├── 20 min: Discussion items │
│ ├── 20 min: Problem-solving together │
│ └── 10 min: Social time (optional) │
│ │
│ Coffee Chat (weekly, 30 min): │
│ ├── Randomly pair team members │
│ ├── No work topics—just connect │
│ └── Optional but encouraged │
│ │
│ Demo Session (bi-weekly, 30 min): │
│ └── Show what you built, share learnings │
└─────────────────────────────────────────────────┘
INFORMAL CHANNELS:
┌─────────────────────────────────────────────────┐
│ #random or #watercooler: │
│ └── Non-work chat, memes, life updates │
│ │
│ #pets, #food, #hobbies: │
│ └── Interest-based channels for bonding │
│ │
│ Virtual social events: │
│ ├── Game sessions │
│ ├── Virtual lunch/coffee │
│ └── Show and tell │
└─────────────────────────────────────────────────┘
Documentation Culture
DOCUMENTATION FOR REMOTE TEAMS
DOCUMENT EVERYTHING:
┌─────────────────────────────────────────────────┐
│ Decisions: │
│ ├── What was decided │
│ ├── Why (rationale) │
│ ├── Who was involved │
│ └── When it was decided │
│ │
│ Processes: │
│ ├── How to do common tasks │
│ ├── Who to contact for what │
│ └── Where to find things │
│ │
│ Context: │
│ ├── Project background │
│ ├── Technical decisions and trade-offs │
│ └── Historical context │
└─────────────────────────────────────────────────┘
DOCUMENTATION LOCATIONS:
┌─────────────────────────────────────────────────┐
│ Type Location │
│ ────────────────────────────────────────── │
│ Work tracking GitScrum │
│ Code docs README, inline comments │
│ Team docs Confluence/Notion │
│ Quick notes Slack threads (then move) │
│ Decisions ADR documents │
│ Runbooks Team wiki │
└─────────────────────────────────────────────────┘
ADR FORMAT (Architecture Decision Record):
┌─────────────────────────────────────────────────┐
│ Title: Use PostgreSQL for primary database │
│ Date: March 15, 2025 │
│ Status: Accepted │
│ │
│ Context: │
│ We need to choose a database for the new │
│ analytics service... │
│ │
│ Decision: │
│ We will use PostgreSQL because... │
│ │
│ Consequences: │
│ • Team will need PostgreSQL training │
│ • Better query performance for our use case │
│ • More complex backup procedures │
└─────────────────────────────────────────────────┘
Remote Onboarding
REMOTE ONBOARDING PROCESS
WEEK 1: FOUNDATIONS
┌─────────────────────────────────────────────────┐
│ Day 1: │
│ ├── Welcome call with manager │
│ ├── Team introduction meeting │
│ ├── IT setup assistance (screen share) │
│ └── First task: Set up dev environment │
│ │
│ Day 2-3: │
│ ├── Company/team documentation reading │
│ ├── Codebase walkthrough (recorded + live) │
│ ├── Pair with buddy on small task │
│ └── Coffee chats with team members │
│ │
│ Day 4-5: │
│ ├── First small PR │
│ ├── Observe team ceremonies │
│ └── 1:1 with manager: Questions, feedback │
└─────────────────────────────────────────────────┘
WEEKS 2-4: INTEGRATION
┌─────────────────────────────────────────────────┐
│ Expectations: │
│ ├── Complete first feature independently │
│ ├── Participate in all team ceremonies │
│ ├── Meet 1:1 with key stakeholders │
│ └── Document any unclear processes │
│ │
│ Support: │
│ ├── Daily check-in with buddy (15 min) │
│ ├── Weekly 1:1 with manager │
│ └── Open access to team for questions │
│ │
│ Success metrics: │
│ ├── Shipping code to production │
│ ├── Actively participating in discussions │
│ └── Self-sufficient for common tasks │
└─────────────────────────────────────────────────┘
BUDDY SYSTEM:
┌─────────────────────────────────────────────────┐
│ Buddy responsibilities: │
│ ├── Daily check-in (Week 1) │
│ ├── Answer questions (no stupid questions) │
│ ├── Pair on tasks │
│ ├── Introduce to team culture │
│ └── Escalate concerns to manager │
│ │
│ Buddy selection: │
│ ├── Experienced team member │
│ ├── Good communicator │
│ ├── Available timezone overlap │
│ └── Volunteer, not voluntold │
└─────────────────────────────────────────────────┘
Preventing Isolation
COMBATING REMOTE ISOLATION
WARNING SIGNS:
┌─────────────────────────────────────────────────┐
│ Individual: │
│ ├── Reduced communication │
│ ├── Camera always off │
│ ├── Missing meetings without notice │
│ ├── Decreased productivity │
│ └── Not participating in social channels │
│ │
│ Team: │
│ ├── Only work talk, no personal │
│ ├── Low engagement in team events │
│ └── Siloed work with no collaboration │
└─────────────────────────────────────────────────┘
PREVENTION STRATEGIES:
┌─────────────────────────────────────────────────┐
│ For individuals: │
│ ├── Regular 1:1s with manager │
│ ├── Buddy/mentor connections │
│ ├── Encourage camera usage │
│ └── Check in on wellbeing, not just work │
│ │
│ For team: │
│ ├── Mandatory fun (but reasonable) │
│ ├── Celebrate wins and milestones │
│ ├── Create space for non-work connection │
│ └── In-person meetups when possible │
│ │
│ For organization: │
│ ├── Mental health resources │
│ ├── Home office stipend │
│ ├── Flexible work hours │
│ └── Encourage time off │
└─────────────────────────────────────────────────┘
Best Practices
- Default to async for most communication
- Document decisions so everyone can access
- Protect overlap time for sync activities
- Build in social time intentionally
- Over-communicate context in writing
- Use video when possible for connection
- Rotate meeting times for timezone fairness
- Check on wellbeing not just work
Anti-Patterns
✗ Requiring constant real-time availability
✗ Meetings that could be async
✗ No documentation of decisions
✗ All work, no social connection
✗ Ignoring timezone differences
✗ Measuring by presence, not output