Release Planning Disconnected from Development
Release planning fails when disconnected from actual development progress. GitScrum connects planning to reality with sprint tracking that shows true velocity, milestone labels that group release features, and Reports that reveal whether you're on track—replacing optimistic guesses with data-driven release dates.
The Disconnect Problem
Why Release Dates Slip
RELEASE PLANNING FAILURES:
┌─────────────────────────────────────────────────────────────┐
│ COMMON DISCONNECTS │
├─────────────────────────────────────────────────────────────┤
│ │
│ ❌ PLANNING IN ISOLATION: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ PM creates release plan in spreadsheet ││
│ │ Developers estimate in different tool ││
│ │ Actual progress tracked nowhere ││
│ │ Surprise! Release date missed ││
│ └─────────────────────────────────────────────────────────┘│
│ │
│ ❌ OPTIMISTIC ASSUMPTIONS: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ "We'll finish 10 features in 4 sprints" ││
│ │ Reality: We finished 6 ││
│ │ No velocity data to inform planning ││
│ │ Same mistake repeated next release ││
│ └─────────────────────────────────────────────────────────┘│
│ │
│ ❌ INVISIBLE PROGRESS: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ "Are we on track for release?" ││
│ │ Nobody knows until it's too late ││
│ │ Last-minute crunch to hit dates ││
│ │ Quality sacrificed for schedule ││
│ └─────────────────────────────────────────────────────────┘│
│ │
└─────────────────────────────────────────────────────────────┘
Connected Release Planning
GitScrum Features for Releases
| Feature | Release Planning Use |
|---|---|
| Milestone labels | Group features by release |
| Sprint tracking | Measure actual velocity |
| Cumulative Flow | Visualize progress over time |
| Project Age Analysis | Spot stalled release items |
| Board filtering | View only release-scoped work |
Release Tracking Setup
Organizing for Release Visibility
RELEASE PLANNING WORKFLOW:
┌─────────────────────────────────────────────────────────────┐
│ CONNECTING PLANNING TO DEVELOPMENT │
├─────────────────────────────────────────────────────────────┤
│ │
│ LABEL STRUCTURE: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ release:v2.0 → All v2.0 features ││
│ │ release:v2.1 → All v2.1 features ││
│ │ release:mvp → Minimum viable features ││
│ │ release:nice-to-have → If time permits ││
│ └─────────────────────────────────────────────────────────┘│
│ │
│ SPRINT PLANNING: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ 1. Filter board by release:v2.0 ││
│ │ 2. See total story points remaining ││
│ │ 3. Compare to team velocity (avg points/sprint) ││
│ │ 4. Calculate: remaining / velocity = sprints needed ││
│ │ 5. Add buffer for unknowns (1.2x - 1.5x) ││
│ └─────────────────────────────────────────────────────────┘│
│ │
│ PROGRESS MONITORING: │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ Weekly check: ││
│ │ • Cumulative Flow shows Done trend ││
│ │ • Compare actual vs planned completion ││
│ │ • Identify at-risk items early ││
│ │ • Adjust scope or date if needed ││
│ └─────────────────────────────────────────────────────────┘│
│ │
└─────────────────────────────────────────────────────────────┘
Data-Driven Release Dates
Velocity-Based Planning
- Measure velocity - Average story points completed per sprint
- Scope the release - Total points for release features
- Calculate timeline - Points ÷ Velocity = Sprints
- Add buffer - 20-50% for unknowns and bugs
- Monitor weekly - Adjust as reality unfolds