Backlog Grooming Best Practices

Backlog grooming (refinement) is the ongoing process of keeping the backlog ready for sprint planning. Good grooming means sprints start smoothly with well-understood work. Poor grooming leads to confusion, poor estimates, and wasted planning time.

Grooming Activities

ActivityPurposeFrequency
Add detailsClarify requirementsEvery item
EstimateEnable planningEvery item
Split storiesRight-sized workLarge items
Remove obsoleteClean backlogRegularly

Grooming Process

Session Structure

GROOMING SESSION
════════════════

BEFORE SESSION:
─────────────────────────────────────
PO prepares:
├── New items to discuss
├── Priority order
├── Context for each item
├── Questions to answer
├── Ready to present
└── Preparation pays off

DURING SESSION:
─────────────────────────────────────
For each item (5-10 min):

1. PO presents item
   ├── What is this?
   ├── Why do we need it?
   ├── Who is it for?
   └── Expected value

2. Team asks questions
   ├── Clarifying details
   ├── Edge cases
   ├── Dependencies
   ├── Technical concerns
   └── Shared understanding

3. Add acceptance criteria
   ├── Given/When/Then
   ├── Edge cases covered
   ├── Testable criteria
   └── Clear definition of done

4. Estimate
   ├── Planning poker
   ├── Quick discussion
   ├── Consensus
   └── Sized for planning

5. Split if needed
   ├── Too large? Break down
   ├── Each piece valuable
   └── Sprint-sized

AFTER SESSION:
─────────────────────────────────────
├── Stories updated in backlog
├── Priorities confirmed
├── Ready for sprint planning
└── Documentation complete

Healthy Backlog

Backlog Structure

HEALTHY BACKLOG
═══════════════

ICEBERG MODEL:
─────────────────────────────────────
Top (ready for sprint):
├── Detailed acceptance criteria
├── Estimated
├── Small enough for sprint
├── Dependencies identified
├── Next 2-3 sprints worth
└── Sprint-ready

Middle (coming soon):
├── Basic description
├── Rough size (T-shirt)
├── Coming in next quarter
├── Needs refinement
└── Pipeline

Bottom (future):
├── Ideas and placeholders
├── No details yet
├── Low priority
├── May never happen
└── Parking lot

BACKLOG VISUALIZATION:
─────────────────────────────────────
╔═══════════════════════════════╗
║  READY (2-3 sprints)          ║ ← Refined, estimated
║  ┌────┐ ┌────┐ ┌────┐ ┌────┐  ║
║  │ 3  │ │ 5  │ │ 2  │ │ 3  │  ║
║  └────┘ └────┘ └────┘ └────┘  ║
╠═══════════════════════════════╣
║  COMING (next quarter)         ║ ← Roughly sized
║  ┌─────┐ ┌──────┐ ┌─────┐     ║
║  │  M  │ │  L   │ │  S  │     ║
║  └─────┘ └──────┘ └─────┘     ║
╠═══════════════════════════════╣
║  FUTURE                        ║ ← Ideas only
║  • idea • concept • maybe     ║
╚═══════════════════════════════╝

DEFINITION OF READY:
─────────────────────────────────────
A story is ready when:
├── ☐ Clear user and value
├── ☐ Acceptance criteria defined
├── ☐ Estimated by team
├── ☐ Small enough for sprint
├── ☐ Dependencies identified
├── ☐ Team understands it
└── Can be pulled into sprint

Estimation in Grooming

Sizing Work

ESTIMATION IN GROOMING
══════════════════════

PLANNING POKER:
─────────────────────────────────────
Quick estimation:
├── PO presents story
├── Team selects cards
├── Reveal simultaneously
├── Discuss differences
├── Converge on number
└── 2-3 minutes per story

HANDLING LARGE ITEMS:
─────────────────────────────────────
If estimate > 13 points:
├── Don't estimate
├── Mark for splitting
├── Split in session or later
├── Re-estimate pieces
└── Small enough for sprint

REFERENCE STORIES:
─────────────────────────────────────
Maintain calibration:
├── 1 point: Simple bug fix
├── 3 points: New API endpoint
├── 5 points: Feature with tests
├── 8 points: Complex integration
├── Compare new work to references
└── Consistent sizing

Common Issues

Grooming Problems

GROOMING CHALLENGES
═══════════════════

STORIES TOO VAGUE:
─────────────────────────────────────
Problem:
├── Team can't estimate
├── Requirements unclear
├── Discussion goes in circles
└── Wasted time

Solution:
├── PO prepares better
├── Defer item until clear
├── Spike to research
├── Don't force it
└── Ready means ready

TOO MANY ITEMS:
─────────────────────────────────────
Problem:
├── Session runs long
├── Team fatigues
├── Quality drops
└── Dread the meeting

Solution:
├── Time-box to 1 hour
├── Focus on top priority
├── Limit items per session
├── Multiple shorter sessions
└── Sustainable pace

NO ONE PREPARED:
─────────────────────────────────────
Problem:
├── PO surprised by items
├── Team unfamiliar
├── Slow progress
└── Ineffective session

Solution:
├── PO prepares items in advance
├── Share agenda before
├── Team reviews beforehand
├── Preparation expected
└── Meeting works better

GitScrum Features

Backlog Management

GITSCRUM FOR GROOMING
═════════════════════

BACKLOG VIEW:
─────────────────────────────────────
├── Prioritized list
├── Drag to reorder
├── Filter by status
├── Refinement status visible
└── Clear backlog view

STORY DETAILS:
─────────────────────────────────────
├── Description with template
├── Acceptance criteria checklist
├── Estimation field
├── Labels for categorization
├── Ready indicator
└── Complete information

REFINEMENT TRACKING:
─────────────────────────────────────
├── Label: needs-refinement
├── Label: ready
├── Filter for grooming session
├── Track what's refined
└── Clear status

SPRINT PLANNING:
─────────────────────────────────────
├── Pull from refined items
├── Capacity visible
├── Drag into sprint
├── Smooth planning
└── Grooming enables planning

Best Practices

For Backlog Grooming

  1. Regular sessions — Weekly rhythm
  2. PO prepares — Come ready
  3. Time-box — 1 hour max
  4. Definition of Ready — Clear criteria
  5. Enough runway — 2-3 sprints ready

Anti-Patterns

GROOMING MISTAKES:
✗ Skip grooming
✗ Groom in sprint planning
✗ No preparation
✗ Estimate everything
✗ Huge backlog (200+ items)
✗ Never remove items
✗ No acceptance criteria
✗ Force unclear items