5 min read • Guide 628 of 877
CI/CD Pipeline Best Practices
Well-designed CI/CD pipelines accelerate delivery without sacrificing quality by catching issues at the earliest possible stage. GitScrum's integration with pipeline tools provides visibility into build status, test results, and deployment progress, helping teams coordinate around their automated delivery processes.
Pipeline Design Principles
Speed vs Thoroughness
PIPELINE STAGE OPTIMIZATION:
┌─────────────────────────────────────────────────────────────┐
│ │
│ FAST FEEDBACK FIRST: │
│ ┌────────┐ ┌────────┐ ┌────────┐ ┌────────┐ ┌────────┐ │
│ │ Lint │→│ Unit │→│ Build │→│ Int. │→│ E2E │ │
│ │ (30s) │ │ (2m) │ │ (3m) │ │ (10m) │ │ (20m) │ │
│ └────────┘ └────────┘ └────────┘ └────────┘ └────────┘ │
│ ↓ ↓ ↓ ↓ ↓ │
│ Fails Fails Fails Fails Fails │
│ fast fast medium slower slowest │
│ │
│ PRINCIPLE: Catch cheap issues before expensive checks │
└─────────────────────────────────────────────────────────────┘
Parallel Execution
PARALLELIZATION STRATEGY:
┌─────────────────────────────────────────────────────────────┐
│ │
│ SEQUENTIAL (slow): PARALLEL (fast): │
│ │
│ Lint ──→ Unit ──→ Build ┌── Lint ──┐ │
│ 5m 3m │ │ │
│ ├── Unit ──┼── Build ──→ │
│ Total: 8 minutes │ 2m │ 3m │
│ └── Type ──┘ │
│ Check │
│ Total: 5 minutes │
│ │
│ PARALLEL CANDIDATES: │
│ • Linting + Type checking + Security scan │
│ • Unit tests across modules │
│ • Integration tests by service │
│ • E2E tests by feature area │
└─────────────────────────────────────────────────────────────┘
Pipeline Reliability
Handling Failures
FAILURE HANDLING PATTERNS:
┌─────────────────────────────────────────────────────────────┐
│ │
│ FAIL FAST: │
│ • Stop pipeline on first failure │
│ • Don't waste resources on doomed builds │
│ • Provide immediate feedback to developers │
│ │
│ RETRY TRANSIENT FAILURES: │
│ • Network timeouts: retry 2-3 times │
│ • External service failures: retry with backoff │
│ • Don't retry deterministic failures │
│ │
│ GRACEFUL DEGRADATION: │
│ • Non-critical checks can warn vs block │
│ • Documentation builds don't block code releases │
│ • Performance tests can be advisory │
└─────────────────────────────────────────────────────────────┘
Caching Strategies
EFFECTIVE CACHING:
┌─────────────────────────────────────────────────────────────┐
│ CACHE TYPE │ BENEFIT │ INVALIDATION │
├───────────────────┼─────────────────────┼───────────────────┤
│ Dependencies │ Skip npm/pip install│ lockfile change │
│ Build artifacts │ Incremental builds │ source change │
│ Docker layers │ Faster image builds │ Dockerfile change │
│ Test fixtures │ Faster test setup │ fixture change │
└───────────────────┴─────────────────────┴───────────────────┘
CACHE BEST PRACTICES:
• Use content-addressable keys (hash of inputs)
• Set appropriate TTLs (1 week for deps)
• Monitor cache hit rates
• Clear caches on strange failures
Monitoring and Observability
Pipeline Metrics
KEY PIPELINE METRICS:
┌─────────────────────────────────────────────────────────────┐
│ METRIC │ TARGET │ ACTION IF MISSED │
├─────────────────────┼─────────────┼─────────────────────────┤
│ Build time │ < 15 min │ Optimize slow stages │
│ Success rate │ > 90% │ Fix flaky tests │
│ Queue time │ < 5 min │ Add more runners │
│ Recovery time │ < 30 min │ Improve rollback │
│ Deploy frequency │ Daily+ │ Reduce batch size │
└─────────────────────────────────────────────────────────────┘
Alerting
PIPELINE ALERTS:
┌─────────────────────────────────────────────────────────────┐
│ CONDITION │ ALERT TO │
├────────────────────────────┼────────────────────────────────┤
│ Main branch broken │ Team channel (high priority) │
│ Build time > 2x normal │ Platform team │
│ Success rate drops 20%+ │ Tech lead + platform │
│ Production deploy failed │ On-call + team lead │
│ Security scan critical │ Security team + tech lead │
└────────────────────────────────────────────────────────────┘
GitScrum Integration
Status Synchronization
GITSCRUM PIPELINE VIEW:
┌─────────────────────────────────────────────────────────────┐
│ Task #234: Implement user authentication │
├─────────────────────────────────────────────────────────────┤
│ │
│ LINKED PIPELINES: │
│ │
│ Branch: feature/user-auth │
│ ┌─────────┐ ┌─────────┐ ┌─────────┐ ┌─────────┐ │
│ │ ✅ Lint │ │ ✅ Test │ │ ✅ Build│ │ ⏳ Deploy│ │
│ │ 32s │ │ 2m 14s │ │ 3m 01s │ │ running│ │
│ └─────────┘ └─────────┘ └─────────┘ └─────────┘ │
│ │
│ Last run: 5 minutes ago │
│ Coverage: 87% (+2%) │
│ [View Full Pipeline] [Re-run] [View Logs] │
└─────────────────────────────────────────────────────────────┘