Try free
4 min read Guide 600 of 877

How to Use GitScrum for IoT Development Projects?

How to use GitScrum for IoT development projects?

Manage IoT development in GitScrum by coordinating hardware, firmware, and cloud teams on shared board, tracking device features across layers, and documenting protocols in NoteVault. Labels identify which layer work belongs to, dependencies track cross-layer coordination. IoT teams with integrated workflow reduce integration issues by 50% [Source: IoT Development Research 2024].

IoT workflow:

  1. Requirements - Device features
  2. Hardware design - PCB, sensors
  3. Firmware - Device software
  4. Cloud - Backend services
  5. Integration - End-to-end
  6. Testing - Device + cloud
  7. Deployment - Fleet rollout

IoT labels

LabelLayer
layer-hardwarePCB, electronics
layer-firmwareDevice code
layer-cloudBackend services
layer-mobileMobile app
area-connectivityWiFi, BLE, cellular
area-sensorsSensor integration
area-otaOver-the-air updates

IoT columns

ColumnPurpose
BacklogAll work
DesignSpecifications
DevelopmentBuilding
Lab TestingDevice testing
IntegrationEnd-to-end
Field TestingReal environment
ProductionReleased

NoteVault IoT documentation

DocumentContent
Hardware specsComponent list, schematics
Firmware APIDevice interface
Cloud APIBackend services
ProtocolsCommunication specs
OTA processUpdate procedures

Cross-layer feature template

## Feature: [name]

### Hardware
- Components: [list]
- Interfaces: [GPIO, I2C, etc.]

### Firmware
- Functionality: [description]
- Memory: [requirements]
- Power: [consumption]

### Cloud
- APIs: [endpoints]
- Data: [formats]
- Processing: [logic]

### Dependencies
- HW → FW: [spec reference]
- FW → Cloud: [API contract]

Layer coordination

FromToHandoff
HardwareFirmwareSchematic, pinout
FirmwareCloudProtocol spec
CloudMobileAPI documentation

Firmware version tracking

FieldTrack
VersionSemantic versioning
CompatibilityHardware versions
ChangesChangelog
Rollout% of fleet

OTA update workflow

PhaseAction
DevelopmentBuild firmware
Lab testTest on devices
Beta rollout5-10% of fleet
MonitorCheck for issues
Full rollout100% rollout
Rollback readyIf issues found

Device testing checklist

TestVerify
FunctionalFeatures work
PowerConsumption acceptable
ConnectivityReliable connection
EnvironmentalTemp, humidity
IntegrationCloud communication

Common IoT issues

IssueSolution
Layer mismatchEarly integration
OTA failuresRollback plan
ConnectivityProtocol documentation
Power drainPower profiling tasks

Fleet management tasks

Task TypePurpose
Firmware updateNew version
Config changeSettings update
MonitoringFleet health
IncidentDevice issues

IoT metrics

MetricTrack
Device uptime% online
OTA success% successful updates
ConnectivityConnection reliability
Integration timeLayer cycle times