Release Planning Disconnected from Development

Release planning fails when disconnected from actual development progress. GitScrum connects planning to reality with sprint tracking that shows true velocity, milestone labels that group release features, and Reports that reveal whether you're on track—replacing optimistic guesses with data-driven release dates.

The Disconnect Problem

Why Release Dates Slip

RELEASE PLANNING FAILURES:
┌─────────────────────────────────────────────────────────────┐
│ COMMON DISCONNECTS                                          │
├─────────────────────────────────────────────────────────────┤
│                                                             │
│ ❌ PLANNING IN ISOLATION:                                   │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ PM creates release plan in spreadsheet                  ││
│ │ Developers estimate in different tool                   ││
│ │ Actual progress tracked nowhere                         ││
│ │ Surprise! Release date missed                           ││
│ └─────────────────────────────────────────────────────────┘│
│                                                             │
│ ❌ OPTIMISTIC ASSUMPTIONS:                                  │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ "We'll finish 10 features in 4 sprints"                 ││
│ │ Reality: We finished 6                                  ││
│ │ No velocity data to inform planning                     ││
│ │ Same mistake repeated next release                      ││
│ └─────────────────────────────────────────────────────────┘│
│                                                             │
│ ❌ INVISIBLE PROGRESS:                                      │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ "Are we on track for release?"                          ││
│ │ Nobody knows until it's too late                        ││
│ │ Last-minute crunch to hit dates                         ││
│ │ Quality sacrificed for schedule                         ││
│ └─────────────────────────────────────────────────────────┘│
│                                                             │
└─────────────────────────────────────────────────────────────┘

Connected Release Planning

GitScrum Features for Releases

FeatureRelease Planning Use
Milestone labelsGroup features by release
Sprint trackingMeasure actual velocity
Cumulative FlowVisualize progress over time
Project Age AnalysisSpot stalled release items
Board filteringView only release-scoped work

Release Tracking Setup

Organizing for Release Visibility

RELEASE PLANNING WORKFLOW:
┌─────────────────────────────────────────────────────────────┐
│ CONNECTING PLANNING TO DEVELOPMENT                          │
├─────────────────────────────────────────────────────────────┤
│                                                             │
│ LABEL STRUCTURE:                                            │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ release:v2.0    → All v2.0 features                     ││
│ │ release:v2.1    → All v2.1 features                     ││
│ │ release:mvp     → Minimum viable features               ││
│ │ release:nice-to-have → If time permits                  ││
│ └─────────────────────────────────────────────────────────┘│
│                                                             │
│ SPRINT PLANNING:                                            │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ 1. Filter board by release:v2.0                         ││
│ │ 2. See total story points remaining                     ││
│ │ 3. Compare to team velocity (avg points/sprint)         ││
│ │ 4. Calculate: remaining / velocity = sprints needed     ││
│ │ 5. Add buffer for unknowns (1.2x - 1.5x)                ││
│ └─────────────────────────────────────────────────────────┘│
│                                                             │
│ PROGRESS MONITORING:                                        │
│ ┌─────────────────────────────────────────────────────────┐│
│ │ Weekly check:                                           ││
│ │ • Cumulative Flow shows Done trend                      ││
│ │ • Compare actual vs planned completion                  ││
│ │ • Identify at-risk items early                          ││
│ │ • Adjust scope or date if needed                        ││
│ └─────────────────────────────────────────────────────────┘│
│                                                             │
└─────────────────────────────────────────────────────────────┘

Data-Driven Release Dates

Velocity-Based Planning

  1. Measure velocity - Average story points completed per sprint
  2. Scope the release - Total points for release features
  3. Calculate timeline - Points ÷ Velocity = Sprints
  4. Add buffer - 20-50% for unknowns and bugs
  5. Monitor weekly - Adjust as reality unfolds