GitScrum / Docs

GitScrum PRO Annual — 5k+ SaaS apps via MCP

Profile Picture

Your profile picture appears throughout GitScrum - in comments, task assignments, team lists, and your profile page. A recognizable photo helps team members identify you quickly.


Overview

Profile pictures are displayed in:

LocationSizeShape
Profile header80pxCircle
Comments32pxCircle
Task assignments24pxCircle
Team lists32pxCircle
Mentions20pxCircle

All display sizes are circular crops of your uploaded image.


Uploading a Picture

Access Upload

From your profile page:

  1. Hover over your current avatar
  2. Click the camera icon overlay
  3. Modal opens with upload interface

Alternatively:

  • Click "Upload Photo" button if visible
  • Camera icon appears on avatar corner

Upload Methods

Method 1: Drag and Drop

  1. Open the upload modal
  2. Drag image file from your computer
  3. Drop onto the upload area
  4. Image processes automatically

Method 2: Click to Browse

  1. Open the upload modal
  2. Click "Browse" link in upload area
  3. File picker opens
  4. Select image file
  5. Image processes automatically

Supported Formats

FormatExtensionSupport
JPEG.jpg, .jpeg✓ Full support
PNG.png✓ Full support
GIF.gif✗ Not supported
WebP.webp✗ Not supported
SVG.svg✗ Not supported

Image Requirements

RequirementSpecification
Minimum size100 × 100 pixels
Maximum size5 MB file size
Aspect ratioAny (will be cropped to square)
RecommendedSquare image, 400 × 400 pixels

Processing

After selecting an image:

  1. Upload - Image transfers to server
  2. Processing - Server optimizes image
  3. Storage - Saved to your profile
  4. Display - Updates across GitScrum
  5. Modal closes - Automatically on success

Progress Indicator

The upload area shows:

  • Upload progress bar
  • Processing status
  • Success/error message

Automatic Updates

After successful upload:

  • Profile page updates immediately
  • Other pages update on next load
  • Team members see new picture immediately
  • Previous picture is replaced (not archived)

Image Guidelines

DoResult
Face clearly visibleEasy identification
Good lightingClear image
Neutral backgroundProfessional appearance
Square cropNo awkward cropping
High resolutionSharp at all sizes

Common Issues

IssueSolution
Face too smallCrop closer before upload
Dark/blurryUse better quality source
StretchedUse square source image
Low resolutionUse higher resolution source

Professional Tips

For professional environments:

  • Use recent photo (current appearance)
  • Business appropriate
  • Consistent with other professional profiles
  • Consider team expectations

For casual environments:

  • Personality welcome
  • Avatars/illustrations acceptable
  • Keep identifiable

Default Avatar

If no picture uploaded, GitScrum displays:

┌─────────────┐
│             │
│      J      │  ← First initial of name
│             │
└─────────────┘
    Green background

Default Appearance

ElementStyle
BackgroundGreen (brand color)
LetterFirst initial, uppercase
FontMonospace, white

This default ensures all users have some avatar even without uploading.


Changing Picture

Replace Current Picture

  1. Click camera icon on current avatar
  2. Upload new image
  3. Old image replaced automatically

No confirmation required - new image immediately replaces old.

Reverting to Default

Currently, you cannot revert to the default initial avatar. To remove a custom picture:

  1. Upload a placeholder image
  2. Or contact support for removal

Technical Details

Image Storage

AspectDetail
StorageCloud storage (CDN)
FormatOptimized JPEG/PNG
VersionsMultiple sizes generated
CachingCDN cached for performance

URL Structure

Profile pictures are served via CDN:

https://cdn.gitscrum.com/avatars/[user-id]/[hash].jpg

URLs change when picture is updated, ensuring fresh images load.


Privacy

Visibility

Your profile picture is visible to:

  • All members of your workspaces
  • Anyone viewing shared content where you're mentioned
  • Not indexed by search engines

Image Ownership

  • You retain ownership of uploaded images
  • GitScrum has license to display within platform
  • Images not shared externally without content

Removal Requests

To permanently remove an image:

  1. Upload replacement image
  2. Or contact support for data deletion

Troubleshooting

Upload Fails

ErrorCauseSolution
File too largeOver 5MBCompress or resize image
Invalid formatNot JPG/PNGConvert to supported format
Network errorConnection issueCheck internet, retry
Server errorTemporary issueWait and retry

Image Doesn't Update

If new image doesn't appear:

  1. Hard refresh browser (Ctrl+F5)
  2. Clear cache for GitScrum domain
  3. Check other pages for update
  4. Wait a few minutes for CDN propagation

Image Looks Wrong

IssueCauseSolution
Cropped poorlyNon-square sourceUpload square image
BlurryLow resolutionUse higher res source
Wrong orientationEXIF rotationRotate before upload

Frequently Asked Questions

Can I upload an animated GIF?

No, only static JPEG and PNG images are supported. GIFs would upload but only show first frame.

What happens to my old picture?

Old pictures are replaced and deleted. GitScrum does not maintain a history of previous avatars.

Can workspace admins change my picture?

No, only you can change your profile picture. Admins cannot modify member avatars.

Is there a picture requirement?

No, profile pictures are optional. The default initial avatar displays if none is uploaded.

Can I use the same picture across multiple accounts?

Yes, you can upload the same image to different GitScrum accounts. Each account stores its own copy.