Probar gratis
4 min lectura Guide 379 of 877

How to Track Performance Optimization Work?

How to track performance optimization work?

Track performance work by creating tasks with measurable targets (e.g., "Reduce page load from 4s to 2s"), documenting baseline metrics in task descriptions, labeling by performance type (perf:frontend, perf:database), and requiring before/after measurements for done. Use NoteVault to maintain performance benchmarks and optimization history.

Performance labels

LabelPurpose
perf:frontendFrontend/client performance
perf:apiAPI response times
perf:databaseDatabase query optimization
perf:memoryMemory usage issues
perf:bundleJavaScript bundle size
perf:imagesImage optimization
perf:cachingCaching improvements
perf:p1Critical performance issue

Performance task template

## Perf: [Component] - [Optimization Goal]

Category: [Frontend/API/Database/Memory]
Priority: [P1/P2/P3]

Baseline metrics:
- Current: 4.2s page load (P95)
- Target: Under 2.0s (P95)
- Measurement: Lighthouse + RUM data

Impact:
- Pages affected: Dashboard, Reports
- Users affected: All users
- Business impact: 32% bounce rate

Root cause:
[Investigation findings]

Proposed optimization:
1. [Specific change 1]
2. [Specific change 2]
3. [Specific change 3]

Verification:
- [ ] Local profiling shows improvement
- [ ] Staging metrics improved
- [ ] Production metrics improved
- [ ] No regressions in other areas

Definition of Done:
- [ ] Before/after metrics documented
- [ ] P95 under 2.0s for 7 days
- [ ] No memory leaks introduced

Performance optimization workflow:

  1. Identify issue - User reports, monitoring alerts
  2. Profile and measure - Establish baseline
  3. Create task - Use template with metrics
  4. Investigate root cause - Profiling, analysis
  5. Propose solution - Document approach
  6. Implement fix - Development work
  7. Measure improvement - Verify locally
  8. Deploy to staging - Test in production-like env
  9. Monitor production - Verify real-world improvement
  10. Document results - Before/after in NoteVault

Performance metrics by type

TypeKey Metrics
FrontendLCP, FID, CLS, TTI, bundle size
APIResponse time P50/P95/P99, throughput
DatabaseQuery time, connection pool usage
MemoryHeap size, GC frequency, leaks
InfrastructureCPU, memory, I/O utilization

NoteVault performance documentation

# Performance Benchmarks

## Current Targets (2025)
| Metric | Target | Current |
|--------|--------|---------|
| Dashboard LCP | < 2.0s | 2.3s |
| API P95 | < 200ms | 180ms |
| Bundle size | < 250KB | 312KB |

## Optimization History

### 2025-01-20: Dashboard Load Optimization
- Before: 4.2s LCP
- After: 2.3s LCP
- Changes: Code splitting, lazy loading
- Impact: 45% improvement

### 2025-01-10: Database Query Optimization
- Before: 850ms avg query
- After: 120ms avg query
- Changes: Added indexes, query rewrite
- Impact: 86% improvement

Performance task prioritization

PriorityCriteriaExample
P1Unacceptable, critical pathCheckout takes 10s
P2Suboptimal, high-trafficDashboard slow
P3Nice-to-haveSettings page