4 min lectura • Guide 599 of 877
How to Use GitScrum for Blockchain Development Projects?
How to use GitScrum for blockchain development projects?
Manage blockchain development in GitScrum with labels for contract development, protocol work, and DApp features. Include security audit in workflow, track testnet deployments, document smart contract specs in NoteVault. Blockchain teams with structured workflow reduce vulnerabilities by 60% [Source: Blockchain Security Research 2024].
Blockchain workflow:
- Specification - Contract design
- Development - Implementation
- Testing - Unit + integration
- Audit - Security review
- Testnet - Testnet deploy
- Verification - Testnet testing
- Mainnet - Production deploy
Blockchain labels
| Label | Purpose |
|---|---|
| type-contract | Smart contracts |
| type-dapp | DApp frontend |
| type-protocol | Protocol work |
| type-integration | Third-party |
| security-audit | Needs audit |
| network-testnet | Testnet work |
| network-mainnet | Mainnet work |
Blockchain columns
| Column | Purpose |
|---|---|
| Backlog | All work |
| Development | Coding |
| Testing | Contract tests |
| Security Audit | External audit |
| Testnet | Testnet deploy |
| Mainnet | Production |
NoteVault blockchain documentation
| Document | Content |
|---|---|
| Contract specs | Function specifications |
| Security model | Threat analysis |
| Audit reports | Audit findings |
| Deployment guide | Deploy procedures |
| Network config | Network settings |
Smart contract task template
## Contract: [name]
### Specification
- Purpose: [description]
- Functions: [list]
- State: [variables]
### Security Considerations
- Access control: [approach]
- Reentrancy: [protection]
- Integer overflow: [handling]
### Testing
- [ ] Unit tests (100% coverage)
- [ ] Integration tests
- [ ] Fuzzing
- [ ] Formal verification
### Audit
- [ ] Internal review
- [ ] External audit
- [ ] Findings addressed
### Deployment
- [ ] Testnet deployed
- [ ] Testnet verified
- [ ] Mainnet deployed
- [ ] Mainnet verified
Security audit workflow
| Phase | Action |
|---|---|
| Prepare | Code freeze |
| Submit | Send to auditor |
| Review | Auditor reviews |
| Report | Receive findings |
| Fix | Address issues |
| Verify | Re-audit fixes |
| Approve | Audit pass |
Audit finding severity
| Severity | Response |
|---|---|
| Critical | Must fix before deploy |
| High | Must fix before deploy |
| Medium | Should fix |
| Low | Consider fixing |
| Informational | Awareness |
Testnet deployment checklist
| Check | Verify |
|---|---|
| All tests pass | 100% coverage |
| Audit complete | Findings addressed |
| Deploy script | Tested |
| Verification | Contract verified |
| Integration | DApp connected |
DApp development
| Layer | Tasks |
|---|---|
| Smart contracts | On-chain logic |
| Backend | Off-chain services |
| Frontend | User interface |
| Wallet | Wallet integration |
Gas optimization tasks
| Task | Focus |
|---|---|
| Gas profiling | Identify expensive ops |
| Optimization | Reduce gas usage |
| Batching | Combine operations |
| Testing | Gas regression tests |
Common blockchain issues
| Issue | Solution |
|---|---|
| Security vulnerabilities | Audit + review |
| Gas costs | Optimization tasks |
| Upgrade issues | Upgrade pattern docs |
| Failed transactions | Error handling |
Blockchain metrics
| Metric | Track |
|---|---|
| Audit findings | By severity |
| Test coverage | % covered |
| Gas costs | Per function |
| Transaction success | % successful |