GitScrum / Docs

GitScrum PRO Annual — 5k+ SaaS apps via MCP

GitScrum Studio available on Google Play for AndroidDownload on Google Play

NoteVault

NoteVault is your personal note-taking workspace inside GitScrum Studio. Organize ideas, meeting notes, technical decisions, and documentation in folders with color coding — all from your phone.


The Problem This Solves

Ideas and decisions happen everywhere — during calls, in meetings, while reviewing code. Without a quick capture tool connected to your work context, notes end up scattered across apps, sticky notes, and messages.

NoteVault integrates note-taking directly into your project management workflow, keeping everything in one place.


What You Are Looking At

Open the drawer menu and tap NoteVault. You see two tabs:

  • Notes — all your notes in a scrollable list
  • Folders — your folder structure for organizing notes

Each note shows its title, color indicator, and last modified timestamp.


Creating a Note

  1. Open NoteVault from the drawer
  2. Tap the + or create button
  3. Enter a title
  4. Write your note content using the rich text editor
  5. Choose a color from 10 options: gray, blue, red, green, yellow, purple, coral, amber, sky, lime
  6. Save

The note appears in your list immediately.


Editing a Note

  1. Tap any note to open it
  2. Edit the title, content, or color
  3. Changes save when you confirm

The rich text editor supports standard formatting for capturing structured content.


Color Coding

Each note can have one of 10 colors:

ColorSuggested Use
GrayGeneral notes
BlueTechnical decisions
RedUrgent or critical
GreenCompleted or approved
YellowIdeas or brainstorms
PurpleDesign or creative
CoralFeedback or reviews
AmberWarnings or blockers
SkyResearch or learning
LimeQuick captures

These are suggestions — use colors in whatever way works for your workflow.


Folders

Creating a Folder

  1. Switch to the Folders tab
  2. Tap the create folder button
  3. Enter a folder name
  4. The folder appears in the list

Moving Notes to Folders

  1. Open a note or use the note options
  2. Select the target folder
  3. The note moves to the selected folder

Browsing Folders

Tap a folder to see all notes inside it. Navigate back to see the full folder list.


Deleting Notes

  1. Open the note
  2. Use the delete action
  3. Confirm the deletion

Deleted notes are removed permanently.


Pro Tips (Once You Are Comfortable)

  • Meeting notes: Create a note before a meeting with the agenda. Add decisions and action items during the meeting.
  • Color for priority: Use red for urgent items and green for resolved items. The color makes visual scanning faster.
  • Folder per project: Create folders matching your project names. This keeps notes organized by context.
  • Quick capture: Use NoteVault as a scratch pad for ideas that might become tasks later. Review and convert them during planning sessions.

Permissions

NoteVault is a personal workspace. Notes are tied to your user account and available across all workspaces. There are no team sharing features in the mobile app for NoteVault — it is your private knowledge base.


How to Report a Problem or Request a Feature

If the app behaves unexpectedly or you have suggestions for improvements, submit feedback through GitScrum Studio.

In the Sidebar of the web application, click on Support Tickets and open a ticket describing your experience.