GitScrum / Docs

GitScrum PRO Annual — 5k+ SaaS apps via MCP

GitScrum Studio available on Google Play for AndroidDownload on Google Play

Quickstart

Get from zero to managing tasks on your phone in under two minutes.


Step 1: Install

Open the Google Play Store on your Android device and search for GitScrum Studio, or use this direct link:

Download on Google Play

Tap Install. The app is lightweight and installs in seconds.


Step 2: Sign In

Open the app. You will see the sign-in screen with four options:

  • GitHub — tap to authenticate with your GitHub account
  • Google — tap to authenticate with your Google account
  • Facebook — tap to authenticate with your Facebook account
  • Email — enter your email and password

If you do not have a GitScrum account, tap Sign Up and create one with your name, email, and password — or sign up via GitHub or Google.

After authentication, the app loads your workspaces.


Step 3: Select a Workspace

The home screen shows your projects from the current workspace. If you belong to multiple workspaces, open the drawer menu (swipe from the left or tap the menu icon) and tap Workspace Selector to switch.


Step 4: Open a Project

Tap any project card on the home screen. The project detail screen opens with your Kanban board showing all task columns and cards.


Step 5: Do Something Useful

Try one of these actions to get started:

Create a task: Tap the + button, select a workflow column, enter a title, and save.

Start a timer: Open a task and tap the timer button. The app begins tracking time immediately.

Check notifications: Open the drawer and tap Notifications to see recent activity.

Capture a note: Open the drawer and tap NoteVault. Create a note with a title and color.


What You Have Now

After these five steps you have:

  • The GitScrum Studio app installed and authenticated
  • Access to all your workspaces and projects
  • The ability to manage tasks, track time, and capture notes
  • Real-time sync with the web application and VS Code extension

Everything you do on your phone syncs instantly across all platforms.