Time Tracking Goals
The Goals tab helps teams set productivity targets and measure progress against them. Define daily and weekly hour goals, track achievement rates, and understand how actual work compares to expectations.
Note: This is a Pro feature.
Interface Overview
The Goals view combines target setting with progress visualization:
Filter Bar
Period Selection: Choose analysis timeframe:
- This Week
- Last Week
- This Month
- Last Month
- Custom Range
Refresh: Update goal calculations with latest data.
KPI Statistics Bar
Six key metrics display across the top:
| Metric | Description |
|---|---|
| Total Hours | Logged time in period |
| Daily Avg | Average hours per working day |
| Weekly Avg | Average hours per week |
| On Target | Days meeting daily goal |
| Hit Rate | Percentage of days hitting goal |
| vs Last Period | Change from previous period |
Progress Visualizations
Multiple displays show goal achievement:
- Weekly progress gauge
- Daily breakdown chart
- Trend comparison
- Heat map of goal achievement
Understanding Goals
What Is a Goal
A goal is a target number of hours:
Daily goal: Hours expected per working day (e.g., 8 hours) Weekly goal: Hours expected per week (e.g., 40 hours)
Goals create accountability and help identify when work patterns deviate from expectations.
Why Set Goals
Personal accountability: Know if you're tracking enough time Team alignment: Ensure everyone logs similar amounts Client commitments: Meet contractual hour requirements Capacity planning: Understand available bandwidth
Goal Sources
Goals may come from:
- Workspace work schedule (default hours)
- Project requirements (contractual)
- Personal targets (self-set)
- Role expectations (manager-defined)
Weekly Progress Gauge
What It Shows
A circular gauge displaying progress toward weekly goal:
Center: Current progress percentage Ring: Visual progress fill Target: Weekly hour goal
Reading the Gauge
| Progress | Indication |
|---|---|
| 0-25% | Early in week or under-tracking |
| 25-75% | On pace mid-week |
| 75-100% | Approaching target |
| 100%+ | Goal exceeded |
Color Coding
Progress colors indicate status:
- Green: On track or ahead
- Yellow: Slightly behind
- Red: Significantly behind
Daily Breakdown Chart
What It Shows
Bar chart displaying hours per day against daily goal:
X-axis: Days of the period Y-axis: Hours logged Target line: Daily goal threshold Bars: Actual logged hours
Pattern Recognition
Consistent bars at target: Healthy routine Variable bars: Inconsistent schedule Many below target: Tracking gap or capacity issue Many above target: Potential overwork
Day Indicators
Bars are color-coded:
- Green bar: Met or exceeded daily goal
- Yellow bar: Close to goal (80-99%)
- Red bar: Significantly under goal
- Grey bar: Non-working day (weekend)
Goal Achievement Metrics
Days Met Goal
Count of days where logged hours ≥ daily goal.
Example: If daily goal is 8 hours and you logged 8+ hours on 15 days, "Days Met Goal: 15"
Goal Completion Rate
Percentage of working days that met the goal:
Goal Completion Rate = (Days Met Goal / Total Working Days) × 100
Example: 15 days met goal out of 20 working days = 75%
vs. Last Period
Comparison to previous equivalent period:
- ↗ Positive %: More hours than last period
- ↘ Negative %: Fewer hours than last period
Comparison Features
Period Comparison
Compare current period to previous:
| Metric | This Period | Last Period | Change |
|---|---|---|---|
| Total Hours | 38h | 42h | -9.5% |
| Daily Avg | 7.6h | 8.4h | -9.5% |
| Hit Rate | 60% | 80% | -20% |
Target vs. Actual
Visual comparison of goals versus logged:
Target weekly: 40 hours (configured) Actual logged: 38 hours Variance: -2 hours (5% under)
Setting Goals
Default Goals
Goals default from workspace work schedule:
- Daily: Hours per day setting
- Weekly: Hours per day × working days
Example: 8 hours/day × 5 days = 40 hours/week
Configuring Work Schedule
To adjust default goals:
- Navigate to Workspace Settings
- Select Work Schedule section
- Set daily expected hours
- Set working days
- Save changes
Goals in the tab update to reflect new settings.
Personal Goals
For personal targets different from team defaults:
- Currently tied to workspace schedule
- Feature request: personal goal override
- Track personally using external targets
Use Cases
Personal Productivity
Track your own consistency:
- Set daily goal matching expectations
- Check Goals tab weekly
- Note days below target
- Adjust work habits accordingly
Team Management
Monitor team tracking:
- Review each member's hit rate
- Identify consistently under-tracking members
- Discuss in 1:1s
- Address barriers to logging
Client Billing
Ensure contractual compliance:
- Set weekly goal to contract hours
- Track progress throughout billing period
- Alert if falling behind
- Adjust to meet commitments
Utilization Tracking
For agencies measuring billable utilization:
- Set target billable hours
- Compare to logged billable time
- Calculate utilization percentage
- Report to leadership
Best Practices
Realistic Goals
Set achievable targets:
- Too low: No challenge, false sense of success
- Too high: Constant failure, demotivating
- Just right: Achievable with focus
Consistent Tracking
Goals only work if time is logged:
- Timer habit every task
- End-of-day review
- Weekly catch-up for gaps
Context Awareness
Goals should account for:
- Meeting-heavy days (less task time)
- Holidays and PTO
- Context switching overhead
- Non-billable necessities
Progressive Adjustment
Adjust goals based on reality:
- Start with team average
- Adjust based on actual capacity
- Increase gradually as habits form
Interpreting Results
Consistently Meeting Goals
If you always hit 100%:
- Goals may be too easy
- Consider increasing target
- Or excellent time management—well done!
Rarely Meeting Goals
If hit rate is below 60%:
- Goals may be unrealistic
- Time tracking may be incomplete
- External blockers may exist
- Discuss with manager
Highly Variable Results
If some days 150%, others 30%:
- Schedule may be inconsistent
- Task switching frequent
- Consider time blocking
- Review calendar for patterns
Heat Map View
What It Shows
A grid showing goal achievement by day:
| Mon | Tue | Wed | Thu | Fri |
|---|---|---|---|---|
| 🟢 | 🟢 | 🟡 | 🟢 | 🔴 |
| 🟢 | 🔴 | 🟢 | 🟢 | 🟢 |
Green: Met goal Yellow: Close to goal Red: Missed goal
Pattern Spotting
Look for patterns:
- Fridays often red? Review end-of-week habits
- Mondays yellow? Meeting-heavy start of week
- Random? Unpredictable workload
Troubleshooting
Goals show zero progress:
- Verify time entries exist in Log tab
- Check date range includes logged time
- Confirm work schedule is configured
Hit rate seems wrong:
- Calculation uses working days only
- Weekends excluded by default
- Holidays may affect count
Goals don't match expectations:
- Check Workspace Settings → Work Schedule
- Verify daily hours setting
- Confirm working days selection
No comparison data:
- Need previous period data
- First month may lack comparison
- Ensure consistent tracking history
Pro Feature Details
Goals is part of the Pro plan. Without Pro:
- Tab shows but prompts upgrade
- Basic hours visible in Log tab
- No goal setting or tracking
What Pro Adds
- Goal setting and tracking
- Progress visualizations
- Comparison analysis
- Achievement metrics
- Heat map view